Tynemouth has 2.9 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 1,000 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.0m across the constituency's 43,829 homes.
Ranks 304 of 650 for clean power approved and not built.
What is stuck, and why
| Project and developer | Tech | Size | Why it is stuck |
|---|---|---|---|
| Standby Embedded Stor Power Plant - Battery storageGreen Frog Power 214 Limited | Battery | 20 MW | Under constructionWho can move it: the developer · earliest connection 2027 (in construction) · planning ref 21/01109/FUL |
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Tynemouth | 2.9 MW | 0 MW | not visible |
| Newcastle upon Tyne East and Wallsend | 2.3 MW | 0 MW | not visible |
| Cramlington and Killingworth | 31 MW | 4 MW | not visible |
Cramlington and Killingworth next door has 31 MW waiting, more than Tynemouth's 2.9 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 1 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.