Power one decision
could release

Projects held up by something a named organisation could act on: a refusal, a planning decision that is overdue, or a grid connection date. Projects with no recorded hold-up are left out, because there is nobody obvious to ask. Every row links to that constituency's briefing, which names the projects and drafts the questions.

Every constituency

MW in projects with an identified decision-maker · planning database, July 2026 · download CSV
#ConstituencyMW that could be releasedWho can move itWhat is holding it up
1Inverness, Skye and West Ross-shire8,447the Scottish Government (it decides big energy projects)Waiting 1.3 years for a planning decision
2Dumfriesshire, Clydesdale and Tweeddale5,918the Scottish Government (it decides big energy projects)Waiting 1.2 years for a planning decision
3Caithness, Sutherland and Easter Ross3,324the developer and the network companyApproved less than a year ago — nothing has happened since
4Newark3,300the Planning Inspectorate (it decides nationally significant projects)Waiting 1.1 years for a planning decision
5Sleaford and North Hykeham2,750North Kesteven CouncilWaiting 1.2 years for a planning decision
6Argyll, Bute and South Lochaber2,462the grid operator (NESO) and SP TransmissionCannot connect to the grid until 2030, 7 years after it was approved
7Berwickshire, Roxburgh and Selkirk2,335the grid operator (NESO) and SP TransmissionCannot connect to the grid until 2026, 3 years after it was approved
8Gordon and Buchan1,824the developer and the network companyApproved a year ago — nothing has happened since
9Doncaster North1,728the grid operator (NESO)Cleared the grid queue review, so it now has a firm connection date
10Easington1,640the grid operator (NESO) and National GridCannot connect to the grid until 2035
11Aberdeenshire North and Moray East1,355the Scottish Government (it decides big energy projects)Waiting 1.1 years for a planning decision
12Kettering1,303North Northamptonshire CouncilWaiting 1.0 years for a planning decision
13Ayr, Carrick and Cumnock1,286the developer and the network companyApproved a year ago — nothing has happened since
14Daventry1,276the Planning Inspectorate (it decides nationally significant projects)Waiting 1.1 years for a planning decision
15South Derbyshire1,208the developer and the network companyApproved a year ago — nothing has happened since
16Gainsborough1,200the grid operator (NESO) and National GridCannot connect to the grid until 2029, 5 years after it was approved
17Selby1,180the grid operator (NESO) and National GridCannot connect to the grid until 2032, 7 years after it was approved
18Dumfries and Galloway1,129the Scottish Government (it decides big energy projects)Waiting 1.4 years for a planning decision
19Brigg and Immingham1,097North Lincolnshire CouncilWaiting 1.1 years for a planning decision
20Richmond and Northallerton1,073North Yorkshire CouncilWaiting 1.6 years for a planning decision
21South Norfolk1,043South Norfolk CouncilWaiting 1.0 years for a planning decision
22Waveney Valley1,012Mid Suffolk CouncilWaiting 1.1 years for a planning decision
23Paisley and Renfrewshire South950the grid operator (NESO)Cleared the grid queue review, so it now has a firm connection date
24North East Hertfordshire944the grid operator (NESO) and National GridCannot connect to the grid until 2034, 9 years after it was approved
25Mid Norfolk901Breckland CouncilWaiting 1.1 years for a planning decision
26Bicester and Woodstock854the Planning Inspectorate (it decides nationally significant projects)Waiting 1.7 years for a planning decision
27Lothian East815the developer and the network companyApproved a year ago — nothing has happened since
28Stretford and Urmston800the grid operator (NESO) and National GridCannot connect to the grid until 2028, 3 years after it was approved
29Angus and Perthshire Glens780the developer and the network companyApproved a year ago — nothing has happened since
30Moray West, Nairn and Strathspey714the developer and the network companyApproved 4 years ago — nothing has happened since
31Inverclyde and Renfrewshire West701the grid operator (NESO) and SP TransmissionCannot connect to the grid until 2029, 5 years after it was approved
32Vale of Glamorgan689Vale of Glamorgan CouncilWaiting 1.2 years for a planning decision
33South Holland and The Deepings628the grid operator (NESO) and National GridCannot connect to the grid until 2033, 10 years after it was approved
34Alloa and Grangemouth625the grid operator (NESO)Cleared the grid queue review, so it now has a firm connection date
35Kilmarnock and Loudoun610the grid operator (NESO)Cleared the grid queue review, so it now has a firm connection date
36Buckingham and Bletchley601the grid operator (NESO)Still in the grid queue review — no firm connection date yet
37Grantham and Bourne581the grid operator (NESO) and National GridCannot connect to the grid until 2028, 3 years after it was approved
38Bassetlaw575Bassetlaw CouncilWaiting 1.2 years for a planning decision
39Honiton and Sidmouth570East Devon CouncilRefused by East Devon Council in 2025
40North West Essex562the grid operator (NESO) and National GridCannot connect to the grid until 2028, 5 years after it was approved
41Airdrie and Shotts562the grid operator (NESO)Cleared the grid queue review, so it now has a firm connection date
42Chester South and Eddisbury537Cheshire West and Chester CouncilWaiting 4.4 years for a planning decision
43Perth and Kinross-shire529the Scottish Government (it decides big energy projects)Waiting 2.2 years for a planning decision
44Mid Buckinghamshire516Buckinghamshire CouncilWaiting 1.3 years for a planning decision
45Staffordshire Moorlands502the developer and the network companyApproved 4 years ago — nothing has happened since
46Alyn and Deeside500Flintshire CouncilWaiting 1.2 years for a planning decision
47Montgomeryshire and Glyndwr487Wrexham CouncilWaiting 2.4 years for a planning decision
48Chippenham460Wiltshire CouncilWaiting 1.1 years for a planning decision
49Goole and Pocklington445the grid operator (NESO)Still in the grid queue review — no firm connection date yet
50Stirling and Strathallan430the grid operator (NESO) and SP TransmissionCannot connect to the grid until 2031, 6 years after it was approved
51Warrington South427Warrington CouncilRefused by Warrington Council in 2025
52Orkney and Shetland420the grid operator (NESO) and SSEN TransmissionCannot connect to the grid until 2032, 9 years after it was approved
53Old Bexley and Sidcup412Bexley CouncilWaiting 1.2 years for a planning decision
54Doncaster East and the Isle of Axholme400the grid operator (NESO) and National GridCannot connect to the grid until 2029
55South Basildon and East Thurrock368the developer and the network companyApproved 4 years ago — nothing has happened since
56Midlothian358the grid operator (NESO) and SP TransmissionCannot connect to the grid until 2031, 6 years after it was approved
57Dunstable and Leighton Buzzard350Central Bedfordshire CouncilRefused by Central Bedfordshire Council in 2025
58Carlisle340the developer and the network companyApproved 2 years ago — nothing has happened since
59Pontypridd331Rhondda Cynon Taf CouncilWaiting 1.1 years for a planning decision
60Witney321West Oxfordshire CouncilWaiting 1.0 years for a planning decision
61Skipton and Ripon319North Yorkshire CouncilWaiting 1.0 years for a planning decision
62Meriden and Solihull East317the developer and the network companyApproved a year ago — nothing has happened since
63Arbroath and Broughty Ferry307the grid operator (NESO) and SSEN TransmissionCannot connect to the grid until 2027, 2 years after it was approved
64Ashford300Ashford CouncilRefused by Ashford Council in 2025
65Dartford300Dartford CouncilRefused by Dartford Council in 2024
66North Ayrshire and Arran298the developer and the network companyApproved 5 years ago — nothing has happened since
67Gower290the developer and the network companyApproved less than a year ago — nothing has happened since
68Runcorn and Helsby282the developer and the network companyApproved 4 years ago — nothing has happened since
69West Aberdeenshire and Kincardine259the Scottish Government (it decides big energy projects)Waiting 2.7 years for a planning decision
70Horsham257the developer and the network companyApproved a year ago — nothing has happened since
71North East Hampshire257Basingstoke and Deane CouncilRefused by Basingstoke and Deane Council in 2026
72Burnley255the developer and the network companyApproved a year ago — nothing has happened since
73Foyle240the developer and the network companyApproved 2 years ago — nothing has happened since
74West Tyrone238Fermanagh and Omagh CouncilWaiting 1.6 years for a planning decision
75East Antrim230Mid and East Antrim CouncilWaiting 3.1 years for a planning decision
76Bexhill and Battle230the developer and the network companyApproved less than a year ago — nothing has happened since
77Wells and Mendip Hills230North Somerset CouncilWaiting 1.1 years for a planning decision
78South Northamptonshire218North Northamptonshire CouncilRefused by North Northamptonshire Council in 2025
79Central Suffolk and North Ipswich216the developer and the network companyApproved a year ago — nothing has happened since
80East Kilbride and Strathaven213the grid operator (NESO) and SP TransmissionCannot connect to the grid until 2030, 5 years after it was approved
81Glenrothes and Mid Fife210the Scottish Government (it decides big energy projects)Waiting 1.5 years for a planning decision
82North East Cambridgeshire210the developer and the network companyApproved 2 years ago — nothing has happened since
83Wetherby and Easingwold203the developer and the network companyApproved a year ago — nothing has happened since
84Lichfield200Lichfield CouncilRefused by Lichfield Council in 2026
85Spelthorne200the grid operator (NESO) and National GridCannot connect to the grid until 2031, 5 years after it was approved
86Stockton North200Stockton-on-Tees CouncilWaiting 1.5 years for a planning decision
87Glasgow North East200the grid operator (NESO)Cleared the grid queue review, so it now has a firm connection date
88Hamilton and Clyde Valley200the Scottish Government (it decides big energy projects)Waiting 1.5 years for a planning decision
89Mid Dunbartonshire200the developer and the network companyApproved a year ago — nothing has happened since
90Merthyr Tydfil and Aberdare200Rhondda Cynon Taf CouncilWaiting 1.2 years for a planning decision
91West Dunbartonshire199the Scottish Government (it decides big energy projects)Waiting 1.6 years for a planning decision
92North East Fife177the grid operator (NESO) and SP TransmissionCannot connect to the grid until 2022, 2 years after it was approved
93Weald of Kent176the developer and the network companyApproved less than a year ago — nothing has happened since
94Dwyfor Meirionnydd171the developer and the network companyApproved less than a year ago — nothing has happened since
95Ely and East Cambridgeshire170the developer and the network companyApproved less than a year ago — nothing has happened since
96Aberdeen North170the developer and the network companyApproved a year ago — nothing has happened since
97Fylde163Fylde CouncilWaiting 1.1 years for a planning decision
98Paisley and Renfrewshire North162the grid operator (NESO) and SP TransmissionCannot connect to the grid until 2030, 7 years after it was approved
99Rugby162the developer and the network companyApproved a year ago — nothing has happened since
100St Austell and Newquay153the developer and the network companyApproved 2 years ago — nothing has happened since
101Coventry East153Coventry CouncilWaiting 1.0 years for a planning decision
102Havant150Havant CouncilWaiting 1.3 years for a planning decision
103Rayleigh and Wickford150the developer and the network companyApproved a year ago — nothing has happened since
104Edinburgh South West150the Scottish Government (it decides big energy projects)Waiting 1.4 years for a planning decision
105Henley and Thame150South Oxfordshire CouncilRefused by South Oxfordshire Council in 2025
106Rushcliffe150the developer and the network companyApproved a year ago — nothing has happened since
107Stroud150Stroud CouncilRefused by Stroud Council in 2023
108West Worcestershire150Malvern Hills CouncilWaiting 1.7 years for a planning decision
109Corby and East Northamptonshire148North Northamptonshire CouncilWaiting 2.9 years for a planning decision
110East Hampshire147East Hampshire CouncilRefused by East Hampshire Council in 2024
111Forest of Dean147the developer and the network companyApproved 3 years ago — nothing has happened since
112Rother Valley143the developer and the network companyApproved less than a year ago — nothing has happened since
113Newport East143Welsh Government (NSIP) CouncilRefused by Welsh Government (NSIP) Council in 2025
114East Londonderry130Derry City and Strabane CouncilWaiting 3.6 years for a planning decision
115Rutherglen130the developer and the network companyApproved less than a year ago — nothing has happened since
116Aberafan Maesteg130Welsh Government (NSIP) CouncilRefused by Welsh Government (NSIP) Council in 2025
117Amber Valley129Amber Valley CouncilRefused by Amber Valley Council in 2022
118Beaconsfield129Buckinghamshire CouncilWaiting 1.0 years for a planning decision
119Melton and Syston127the developer and the network companyApproved 4 years ago — nothing has happened since
120Wycombe126Buckinghamshire CouncilWaiting 2.7 years for a planning decision
121Shrewsbury125Shropshire CouncilWaiting 1.4 years for a planning decision
122Hexham122Newcastle upon Tyne CouncilWaiting 2.2 years for a planning decision
123Brecon, Radnor and Cwm Tawe121the grid operator (NESO) and National GridCannot connect to the grid until 2037, 13 years after it was approved
124Barking120Barking and Dagenham CouncilWaiting 2.3 years for a planning decision
125Portsmouth North120Portsmouth CouncilWaiting 1.0 years for a planning decision
126West Lancashire120the developer and the network companyApproved a year ago — nothing has happened since
127Livingston117the developer and the network companyApproved a year ago — nothing has happened since
128Stone, Great Wyrley and Penkridge114the developer and the network companyApproved a year ago — nothing has happened since
129Wrexham114Welsh Government (NSIP) CouncilWaiting 2.1 years for a planning decision
130North Dorset112the grid operator (NESO) and National GridCannot connect to the grid until 2036, 13 years after it was approved
131Stafford110Stafford CouncilWaiting 2.4 years for a planning decision
132Rotherham110Rotherham CouncilWaiting 1.0 years for a planning decision
133South Ribble107the grid operator (NESO)Cleared the grid queue review, so it now has a firm connection date
134Normanton and Hemsworth102Wakefield CouncilWaiting 4.1 years for a planning decision
135South Cambridgeshire102South Cambridgeshire CouncilWaiting 1.4 years for a planning decision
136Torridge and Tavistock101the developer and the network companyApproved a year ago — nothing has happened since
137Cannock Chase100Cannock Chase CouncilRefused by Cannock Chase Council in 2026
138Kingswinford and South Staffordshire100South Staffordshire CouncilRefused by South Staffordshire Council in 2025
139Maldon100Chelmsford CouncilRefused by Chelmsford Council in 2022
140North West Norfolk100the developer and the network companyApproved a year ago — nothing has happened since
141South Shropshire100the developer and the network companyApproved less than a year ago — nothing has happened since
142Stoke-on-Trent South100Staffordshire Moorlands CouncilWaiting 1.2 years for a planning decision
143North Antrim100Causeway Coast and Glens CouncilWaiting 1.4 years for a planning decision
144Herne Bay and Sandwich100the developer and the network companyApproved less than a year ago — nothing has happened since
145Glasgow South West100the developer and the network companyApproved a year ago — nothing has happened since
146Dover and Deal99Dover CouncilWaiting 1.1 years for a planning decision
147South Devon99South Hams CouncilWaiting 1.6 years for a planning decision
148Frome and East Somerset99Somerset CouncilRefused by Somerset Council in 2026
149Washington and Gateshead South98Gateshead CouncilRefused by Gateshead Council in 2026
150Na h-Eileanan an Iar98the developer and the network companyApproved 5 years ago — nothing has happened since
151North Cornwall94Cornwall CouncilRefused by Cornwall Council in 2025
152West Suffolk93the developer and the network companyApproved 2 years ago — nothing has happened since
153North Bedfordshire92the developer and the network companyApproved a year ago — nothing has happened since
154Rossendale and Darwen85Rossendale CouncilRefused by Rossendale Council in 2025
155South Cotswolds83the grid operator (NESO) and National GridCannot connect to the grid until 2025, 1 years after it was approved
156Arundel and South Downs82the developer and the network companyApproved a year ago — nothing has happened since
157Newport West and Islwyn82Welsh Government (NSIP) CouncilWaiting 1.2 years for a planning decision
158Motherwell, Wishaw and Carluke80the grid operator (NESO) and SP TransmissionCannot connect to the grid until 2028, 6 years after it was approved
159Mid Dorset and North Poole80the grid operator (NESO) and National GridCannot connect to the grid until 2025, 4 years after it was approved
160Blaydon and Consett78the developer and the network companyApproved 4 years ago — nothing has happened since
161Harpenden and Berkhamsted75St Albans CouncilWaiting 1.1 years for a planning decision
162Torfaen75Welsh Government (NSIP) CouncilWaiting 1.4 years for a planning decision
163Didcot and Wantage74the developer and the network companyApproved a year ago — nothing has happened since
164Barrow and Furness72Westmorland and Furness CouncilWaiting 1.4 years for a planning decision
165Kenilworth and Southam70the developer and the network companyApproved a year ago — nothing has happened since
166Mid Bedfordshire68the developer and the network companyApproved less than a year ago — nothing has happened since
167South Antrim68the developer and the network companyApproved less than a year ago — nothing has happened since
168Thornbury and Yate66the developer and the network companyApproved 2 years ago — nothing has happened since
169Droitwich and Evesham66Wychavon CouncilWaiting 2.1 years for a planning decision
170Tonbridge65Sevenoaks CouncilWaiting 1.5 years for a planning decision
171North Warwickshire and Bedworth63the developer and the network companyApproved less than a year ago — nothing has happened since
172Broadland and Fakenham63the developer and the network companyApproved less than a year ago — nothing has happened since
173South Dorset62the developer and the network companyApproved a year ago — nothing has happened since
174Clwyd North62Welsh Government (NSIP) CouncilRefused by Welsh Government (NSIP) Council in 2022
175Epping Forest61Epping Forest CouncilRefused by Epping Forest Council in 2026
176York Outer60the developer and the network companyApproved less than a year ago — nothing has happened since
177Knowsley58Knowsley CouncilWaiting 1.3 years for a planning decision
178Hitchin57North Hertfordshire CouncilWaiting 1.2 years for a planning decision
179Harwich and North Essex54the developer and the network companyApproved 4 years ago — nothing has happened since
180North West Hampshire51Basingstoke and Deane CouncilWaiting 1.1 years for a planning decision
181Blyth and Ashington50the developer and the network companyApproved less than a year ago — nothing has happened since
182East Surrey50Tandridge CouncilWaiting 1.1 years for a planning decision
183Exmouth and Exeter East50the developer and the network companyApproved 3 years ago — nothing has happened since
184North Herefordshire50Herefordshire, County of CouncilRefused by Herefordshire, County of Council in 2024
185Oxford West and Abingdon50Vale of White Horse CouncilRefused by Vale of White Horse Council in 2025
186Southend East and Rochford50Rochford CouncilWaiting 2.9 years for a planning decision
187Sutton Coldfield50Birmingham CouncilWaiting 1.6 years for a planning decision
188Warwick and Leamington50Warwick CouncilRefused by Warwick Council in 2025
189Blaenau Gwent and Rhymney50the developer and the network companyApproved 2 years ago — nothing has happened since
190Cardiff South and Penarth50the developer and the network companyApproved a year ago — nothing has happened since
191Barnsley North50Barnsley CouncilWaiting 1.5 years for a planning decision
192Basildon and Billericay50Basildon CouncilRefused by Basildon Council in 2023
193Bolsover50the developer and the network companyApproved less than a year ago — nothing has happened since
194Christchurch50Bournemouth, Christchurch and Poole CouncilWaiting 1.0 years for a planning decision
195Hornchurch and Upminster50Havering CouncilWaiting 5.3 years for a planning decision
196Lewes50Wealden CouncilRefused by Wealden Council in 2023
197Loughborough50Charnwood CouncilWaiting 1.5 years for a planning decision
198North Northumberland50the grid operator (NESO) and SSEN TransmissionCannot connect to the grid until 2027, 3 years after it was approved
199North West Leicestershire50the developer and the network companyApproved less than a year ago — nothing has happened since
200Rutland and Stamford50the developer and the network companyApproved 2 years ago — nothing has happened since
201Sevenoaks50the developer and the network companyApproved 3 years ago — nothing has happened since
202Southampton Itchen50the developer and the network companyApproved a year ago — nothing has happened since
203Tewkesbury50the developer and the network companyApproved 5 years ago — nothing has happened since
204Belfast West50Belfast CouncilWaiting 6.0 years for a planning decision
205Dundee Central50the developer and the network companyApproved 2 years ago — nothing has happened since
206Edinburgh South50City of Edinburgh CouncilWaiting 2.4 years for a planning decision
207North Cotswolds50the developer and the network companyApproved 4 years ago — nothing has happened since
208St Neots and Mid Cambridgeshire46the developer and the network companyApproved 4 years ago — nothing has happened since
209Bury St Edmunds and Stowmarket42the developer and the network companyApproved 2 years ago — nothing has happened since
210North East Somerset and Hanham42the developer and the network companyApproved a year ago — nothing has happened since
211Aylesbury40the developer and the network companyApproved 4 years ago — nothing has happened since
212Banbury40Cherwell CouncilWaiting 1.0 years for a planning decision
213Salisbury40the developer and the network companyApproved 6 years ago — nothing has happened since
214South Shields40South Tyneside CouncilWaiting 2.1 years for a planning decision
215Suffolk Coastal40East Suffolk CouncilWaiting 1.1 years for a planning decision
216South Down40Newry, Mourne and Down CouncilWaiting 11.3 years for a planning decision
217Witham39the developer and the network companyApproved a year ago — nothing has happened since
218Westmorland and Lonsdale38the developer and the network companyApproved a year ago — nothing has happened since
219Cowdenbeath and Kirkcaldy37the developer and the network companyApproved a year ago — nothing has happened since
220East Wiltshire35Swindon CouncilWaiting 1.2 years for a planning decision
221Huntingdon35the developer and the network companyApproved a year ago — nothing has happened since
222Taunton and Wellington34Somerset CouncilWaiting 1.1 years for a planning decision
223City of Durham32County Durham CouncilWaiting 2.7 years for a planning decision
224Folkestone and Hythe31Folkestone and Hythe CouncilWaiting 1.3 years for a planning decision
225Hazel Grove30the developer and the network companyApproved a year ago — nothing has happened since
226Hertsmere30the developer and the network companyApproved less than a year ago — nothing has happened since
227Penrith and Solway30the developer and the network companyApproved a year ago — nothing has happened since
228South West Wiltshire30the developer and the network companyApproved 3 years ago — nothing has happened since
229The Wrekin30the developer and the network companyApproved 5 years ago — nothing has happened since
230Thirsk and Malton30the developer and the network companyApproved 5 years ago — nothing has happened since
231Clacton29the developer and the network companyApproved 3 years ago — nothing has happened since
232North Durham27the developer and the network companyApproved less than a year ago — nothing has happened since
233Oldham East and Saddleworth27Oldham CouncilWaiting 1.0 years for a planning decision
234Tatton26Cheshire West and Chester CouncilWaiting 1.4 years for a planning decision
235Mid Ulster26the developer and the network companyApproved less than a year ago — nothing has happened since
236Neath and Swansea East25Welsh Government (NSIP) CouncilWaiting 1.3 years for a planning decision
237Bathgate and Linlithgow24the developer and the network companyApproved a year ago — nothing has happened since
238North West Cambridgeshire22the developer and the network companyApproved a year ago — nothing has happened since
239Dorking and Horley22the developer and the network companyApproved less than a year ago — nothing has happened since
240Hinckley and Bosworth22the developer and the network companyApproved 4 years ago — nothing has happened since
241Glastonbury and Somerton21Somerset CouncilWaiting 1.0 years for a planning decision
242Scunthorpe20the developer and the network companyApproved 4 years ago — nothing has happened since
243Burton and Uttoxeter20East Staffordshire CouncilWaiting 1.0 years for a planning decision
244South Leicestershire20the developer and the network companyApproved 3 years ago — nothing has happened since
245Yeovil18the developer and the network companyApproved 4 years ago — nothing has happened since
246Central Ayrshire18the developer and the network companyApproved 3 years ago — nothing has happened since
247New Forest East17the developer and the network companyApproved less than a year ago — nothing has happened since
248Mid and South Pembrokeshire17the developer and the network companyApproved a year ago — nothing has happened since
249Bridgwater17the developer and the network companyApproved a year ago — nothing has happened since
250Broxtowe16the developer and the network companyApproved a year ago — nothing has happened since
251Doncaster Central16the developer and the network companyApproved 3 years ago — nothing has happened since
252Welwyn Hatfield16Welwyn Hatfield CouncilWaiting 1.1 years for a planning decision
253Faversham and Mid Kent15the developer and the network companyApproved less than a year ago — nothing has happened since
254Lancaster and Wyre15the developer and the network companyApproved 4 years ago — nothing has happened since
255Melksham and Devizes15the developer and the network companyApproved 4 years ago — nothing has happened since
256North Somerset15the developer and the network companyApproved a year ago — nothing has happened since
257East Renfrewshire15the developer and the network companyApproved a year ago — nothing has happened since
258Cardiff East15the developer and the network companyApproved 2 years ago — nothing has happened since
259Godalming and Ash14Waverley CouncilWaiting 5.7 years for a planning decision
260West Dorset12the developer and the network companyApproved 5 years ago — nothing has happened since
261Fareham and Waterlooville10the developer and the network companyApproved less than a year ago — nothing has happened since
262Runnymede and Weybridge10Runnymede CouncilWaiting 1.0 years for a planning decision
263Lowestoft10East Suffolk CouncilRefused by East Suffolk Council in 2024
264Winchester10the developer and the network companyApproved a year ago — nothing has happened since
265Worsley and Eccles10Wigan CouncilWaiting 1.9 years for a planning decision
266Blackpool North and Fleetwood9.3the developer and the network companyApproved 5 years ago — nothing has happened since
267Strangford8.8Ards and North Down CouncilWaiting 2.2 years for a planning decision
268Hertford and Stortford7.3the developer and the network companyApproved less than a year ago — nothing has happened since
269Rhondda and Ogmore7.2the developer and the network companyApproved 2 years ago — nothing has happened since
270Ashfield7Ashfield CouncilRefused by Ashfield Council in 2026
271Chester North and Neston5the developer and the network companyApproved less than a year ago — nothing has happened since
272Milton Keynes North5Milton Keynes CouncilRefused by Milton Keynes Council in 2024
273North Shropshire5the developer and the network companyApproved less than a year ago — nothing has happened since
274Lagan Valley5the developer and the network companyApproved less than a year ago — nothing has happened since
275Hartlepool4.3the developer and the network companyApproved 4 years ago — nothing has happened since
276Tiverton and Minehead4.3the developer and the network companyApproved 2 years ago — nothing has happened since
277Belfast North4.1Belfast CouncilRefused by Belfast Council in 2021
278Newton Aycliffe and Spennymoor3.3the developer and the network companyApproved a year ago — nothing has happened since
279South West Hertfordshire3Three Rivers CouncilWaiting 3.8 years for a planning decision
280Widnes and Halewood3the developer and the network companyApproved 3 years ago — nothing has happened since
281Greenwich and Woolwich2.9the developer and the network companyApproved 5 years ago — nothing has happened since
282Surrey Heath2.4Surrey Heath CouncilRefused by Surrey Heath Council in 2024
283Rawmarsh and Conisbrough2.1the developer and the network companyApproved 9 years ago — nothing has happened since
284Windsor2Slough CouncilRefused by Slough Council in 2024
285Belfast South and Mid Down2the developer and the network companyApproved 7 years ago — nothing has happened since
286Llanelli1.6the developer and the network companyApproved 5 years ago — nothing has happened since
287Maidenhead1.3the developer and the network companyApproved 2 years ago — nothing has happened since
288New Forest West1.3the developer and the network companyApproved a year ago — nothing has happened since
289Stratford-on-Avon1.2the developer and the network companyApproved 3 years ago — nothing has happened since
290Hammersmith and Chiswick1Hammersmith and Fulham CouncilWaiting 3.1 years for a planning decision
291Liverpool Walton1Liverpool CouncilWaiting 3.1 years for a planning decision
292North Devon1the developer and the network companyApproved less than a year ago — nothing has happened since
293Warrington North1the developer and the network companyApproved less than a year ago — nothing has happened since