 "pcon24cd": "E14001557",
 "name": "Tynemouth",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 0.0,
   "sites": 0
  }
 },
 "number2": {
  "stuck_mw": 2.9,
  "stuck_mw_int": 3,
  "stuck_sites": 4,
  "homes_equivalent": 1000,
  "homes_vs_seat_households": 0.02,
  "stuck_mw_12m_cut": 2.9,
  "consented_not_built_mw_any_age": 3.1,
  "operational_mw": 0.0,
  "operational_homes_equivalent": 0,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 1.6,
  "rank": 304,
  "tech_mix": {
   "solar": 2.9
  },
  "tech_summary": "all solar",
  "waiting_vs_running": null,
  "projects": [
   {
    "site_name": "North Tyneside General Hospital - Solar Panels",
    "repd_ref_id": 9687,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 1.0,
    "homes_equivalent": 400,
    "consented": "2021-11-04",
    "months_waiting": 56.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Unit A, Merlin Way -  Solar Panels",
    "repd_ref_id": 15097,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.7,
    "homes_equivalent": 200,
    "consented": "2023-12-01",
    "months_waiting": 32.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Unit B, Merlin Way - Solar Panels",
    "repd_ref_id": 15105,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.7,
    "homes_equivalent": 200,
    "consented": "2023-11-30",
    "months_waiting": 32.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Unit C, Merlin Way - Solar Panels",
    "repd_ref_id": 15098,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.5,
    "homes_equivalent": 200,
    "consented": "2023-12-01",
    "months_waiting": 32.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Border Control Post, Coble Dene - Solar Panels",
    "repd_ref_id": 19339,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2025-09-17",
    "months_waiting": 10.5,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 43829,
  "seat_total_gbp": 4000000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 25.0,
  "building_mw": 20.0,
  "approved_mw": 0.0,
  "approved_24m_mw": 0.0,
  "refused_mw": 0.0,
  "submitted_mw": 0.0,
  "sites": [
   {
    "site_name": "Tynemouth Energy Storage System (TESS)",
    "capacity_mw": 25.0,
    "status": "operating",
    "year": null,
    "homes_while_discharging": 88000
   },
   {
    "site_name": "Standby Embedded Stor Power Plant - Battery storage",
    "capacity_mw": 20.0,
    "status": "building",
    "year": 2021,
    "homes_while_discharging": 70000
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Standby Embedded Stor Power Plant - Battery storage",
   "repd_ref_id": 9010,
   "technology": "Battery",
   "capacity_mw": 20.0,
   "homes_equivalent": null,
   "status": "Under Construction",
   "consented": "2021-06-16",
   "refused": null,
   "planning_authority": "North Tyneside",
   "planning_ref": "21/01109/FUL",
   "operator": "Green Frog Power 214 Limited",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001378",
  "E14001183"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}