Waveney Valley
Waveney Valley has 59 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 22,000 homes. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. That cost is shared across every bill in Britain, so households here pay for it too: about £92 a year per household, £3.6m across the constituency's 39,383 homes.
here
The waiting list
Every approved, unbuilt project
| Site | Technology | Enough for | Capacity | Approved | Waiting |
|---|---|---|---|---|---|
| The Grange Solar Farm & Battery Storage | Solar Photovoltaics | 17,000 homes | 48.0 MW | 2023-11 | 2.7 yrs |
| Suggenhall Farm - Photovoltaic Solar Array & Battery Storage | Solar Photovoltaics | 2,700 homes | 7.3 MW | 2024-04 | 2.3 yrs |
| Cranswick Country Foods | Solar Photovoltaics | 500 homes | 1.5 MW | 2021-04 | 5.3 yrs |
| Farmers Industrial Estate,Mill Road - Solar PV Systems | Solar Photovoltaics | 400 homes | 1.2 MW | 2024-04 | 2.3 yrs |
| Spectra Packaging Solutions Limited, Antonine Way - Solar Panels | Solar Photovoltaics | 300 homes | 0.7 MW | 2023-09 | 2.9 yrs |
| Roger Skinner - Solar panels | Solar Photovoltaics | 200 homes | 0.6 MW | 2021-09 | 4.9 yrs |
Plus 7 more approved within the last two years.
Batteries
| Site | Size | Status | While discharging |
|---|---|---|---|
| Red House Farm, Old Norwich Road - Battery Energy Storage System | 520 MW | in planning | could supply ≈1,822,000 homes |
| Market Lane And Carr Lane, Great Moulton - Battery Energy Storage System | 400 MW | in planning | could supply ≈1,402,000 homes |
| Yaxley, Eye Airfield Industrial Estate - Battery Storage System | 200 MW | approved, not built 2025 | could supply ≈701,000 homes |
| Norwich Road Industrial Estate | 50 MW | being built 2021 | could supply ≈175,000 homes |
| Wissett Solar Farm, Wissett - Battery Storage (Apple Tree) | 10 MW | approved, not built 2025 | could supply ≈35,000 homes |
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →