 "pcon24cd": "E14001569",
 "name": "Waveney Valley",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 16.5,
   "sites": 2
  }
 },
 "number2": {
  "stuck_mw": 59.3,
  "stuck_mw_int": 59,
  "stuck_sites": 6,
  "homes_equivalent": 22000,
  "homes_vs_seat_households": 0.55,
  "stuck_mw_12m_cut": 110.1,
  "consented_not_built_mw_any_age": 140.6,
  "operational_mw": 64.0,
  "operational_homes_equivalent": 32000,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 5.4,
  "rank": 109,
  "tech_mix": {
   "solar": 59.3
  },
  "tech_summary": "all solar",
  "waiting_vs_running": 0.9,
  "projects": [
   {
    "site_name": "The Grange Solar Farm & Battery Storage",
    "repd_ref_id": 20389,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 48.0,
    "homes_equivalent": 17000,
    "consented": "2023-11-09",
    "months_waiting": 32.8,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Marsh Lane Solar Farm,  Lion Road - Solar Farm",
    "repd_ref_id": 13987,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 30.0,
    "homes_equivalent": 11000,
    "consented": "2025-08-13",
    "months_waiting": 11.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Wissett Solar Farm, Wissett - Solar Photovoltaic (PV) Farm (Apple Tree)",
    "repd_ref_id": 9912,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 27.0,
    "homes_equivalent": 9800,
    "consented": "2025-02-17",
    "months_waiting": 17.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Station Road, Tivetshall St Margaret - Solar PV Panels",
    "repd_ref_id": 16035,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 20.0,
    "homes_equivalent": 7300,
    "consented": "2025-06-30",
    "months_waiting": 13.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Suggenhall Farm - Photovoltaic Solar Array & Battery Storage",
    "repd_ref_id": 10164,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 7.3,
    "homes_equivalent": 2700,
    "consented": "2024-04-17",
    "months_waiting": 27.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Gressingham Foods, Hinderclay Road - Solar Array",
    "repd_ref_id": 16535,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 3.5,
    "homes_equivalent": 1300,
    "consented": "2024-11-11",
    "months_waiting": 20.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Cranswick Country Foods",
    "repd_ref_id": 8436,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 1.5,
    "homes_equivalent": 500,
    "consented": "2021-04-29",
    "months_waiting": 63.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Farmers Industrial Estate,Mill Road - Solar PV Systems",
    "repd_ref_id": 13817,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 1.2,
    "homes_equivalent": 400,
    "consented": "2024-04-03",
    "months_waiting": 28.0,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Spectra Packaging Solutions Limited, Antonine Way - Solar Panels",
    "repd_ref_id": 14552,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.7,
    "homes_equivalent": 300,
    "consented": "2023-09-07",
    "months_waiting": 34.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Roger Skinner - Solar panels",
    "repd_ref_id": 9338,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.6,
    "homes_equivalent": 200,
    "consented": "2021-09-02",
    "months_waiting": 59.0,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Home Farm - Solar Panels",
    "repd_ref_id": 20608,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2026-05-07",
    "months_waiting": 2.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Burnt House Farm, Hoxne Road - Solar PV Array",
    "repd_ref_id": 17006,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2025-01-03",
    "months_waiting": 19.0,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Bartrums Road Service, Brome Industrial Park - Solar Panels",
    "repd_ref_id": 20777,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.1,
    "homes_equivalent": 100,
    "consented": "2026-06-09",
    "months_waiting": 1.8,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 39383,
  "seat_total_gbp": 3600000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0.0,
  "building_mw": 50.0,
  "approved_mw": 210.8,
  "approved_24m_mw": 0.0,
  "refused_mw": 0.2,
  "submitted_mw": 920.2,
  "sites": [
   {
    "site_name": "Red House Farm, Old Norwich Road - Battery Energy Storage System",
    "capacity_mw": 520.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 1822000
   },
   {
    "site_name": "Market Lane And Carr Lane, Great Moulton - Battery Energy Storage System",
    "capacity_mw": 400.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 1402000
   },
   {
    "site_name": "Yaxley, Eye Airfield Industrial Estate - Battery Storage System",
    "capacity_mw": 200.0,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 701000
   },
   {
    "site_name": "Norwich Road Industrial Estate",
    "capacity_mw": 50.0,
    "status": "building",
    "year": 2021,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "Wissett Solar Farm, Wissett - Battery Storage  (Apple Tree)",
    "capacity_mw": 10.0,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 35000
   },
   {
    "site_name": "Burnt House Farm, Hoxne Road - BESS",
    "capacity_mw": 0.4,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 1500
   },
   {
    "site_name": "Halesworth Middle School, Harrisons Lane - Micro Energy Storage System",
    "capacity_mw": 0.2,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 700
   },
   {
    "site_name": "Progress Way, Eye Airfield Industrial Estate - Micro Energy Storage",
    "capacity_mw": 0.2,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 700
   },
   {
    "site_name": "Progress Way, Mid Suffolk Business Park - Energy Storage System",
    "capacity_mw": 0.2,
    "status": "approved",
    "year": 2026,
    "homes_while_discharging": 700
   },
   {
    "site_name": "Ellough Road, Ellough - Micro Energy Storage",
    "capacity_mw": 0.2,
    "status": "refused",
    "year": 2026,
    "homes_while_discharging": 700
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Red House Farm, Old Norwich Road - Battery Energy Storage System",
   "repd_ref_id": 18291,
   "technology": "Battery",
   "capacity_mw": 520.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Mid Suffolk",
   "planning_ref": "DC/25/02824",
   "operator": "The Surrey Research Park",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 13 months for a planning decision",
    "who": "Mid Suffolk Council",
    "evidence": {
     "submitted": "2025-06-24",
     "months_waiting": 13
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Market Lane And Carr Lane, Great Moulton - Battery Energy Storage System",
   "repd_ref_id": 18554,
   "technology": "Battery",
   "capacity_mw": 400.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "South Norfolk",
   "planning_ref": "2025/1689",
   "operator": "Field Long Stratton Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 14 months for a planning decision",
    "who": "South Norfolk Council",
    "evidence": {
     "submitted": "2025-06-06",
     "months_waiting": 14
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Yaxley, Eye Airfield Industrial Estate - Battery Storage System",
   "repd_ref_id": 17833,
   "technology": "Battery",
   "capacity_mw": 200.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-07-04",
   "refused": null,
   "planning_authority": "Mid Suffolk",
   "planning_ref": "DC/24/05535",
   "operator": "Field Yaxley Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-07-04",
     "years_since_consent": 1.1
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Norwich Road Industrial Estate",
   "repd_ref_id": 12529,
   "technology": "Battery",
   "capacity_mw": 50.0,
   "homes_equivalent": null,
   "status": "Under Construction",
   "consented": "2021-03-26",
   "refused": "2021-03-26",
   "planning_authority": "East Suffolk",
   "planning_ref": "DC/21/0521/FUL",
   "operator": "Eelpower Limited",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Semere Lane, Dickleburgh - Solar Farm",
   "repd_ref_id": 18423,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.9,
   "homes_equivalent": 18000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "South Norfolk",
   "planning_ref": "2025/2000",
   "operator": "Regener8 Power Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 13 months for a planning decision",
    "who": "South Norfolk Council",
    "evidence": {
     "submitted": "2025-07-03",
     "months_waiting": 13
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "The Grange Solar Farm & Battery Storage",
   "repd_ref_id": 20389,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 48.0,
   "homes_equivalent": 17000,
   "status": "Awaiting Construction",
   "consented": "2023-11-09",
   "refused": null,
   "planning_authority": "Mid Suffolk",
   "planning_ref": "DC/22/02667",
   "operator": "Pathfinder Clean Energy UK Dev Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-11-09",
     "years_since_consent": 2.7
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Redisham Hall Farm, School Road - Solar Panels",
   "repd_ref_id": 18464,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 42.0,
   "homes_equivalent": 15000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "East Suffolk",
   "planning_ref": "DC/25/2109/FUL",
   "operator": "Opdenergy",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 14 months for a planning decision",
    "who": "East Suffolk Council",
    "evidence": {
     "submitted": "2025-06-10",
     "months_waiting": 14
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Marsh Lane Solar Farm,  Lion Road - Solar Farm",
   "repd_ref_id": 13987,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 30.0,
   "homes_equivalent": 11000,
   "status": "Awaiting Construction",
   "consented": "2025-08-13",
   "refused": null,
   "planning_authority": "South Norfolk",
   "planning_ref": "DC/23/05426",
   "operator": "Aura Power Storage Solutions",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-08-13",
     "years_since_consent": 1.0
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Wissett Solar Farm, Wissett - Solar Photovoltaic (PV) Farm (Apple Tree)",
   "repd_ref_id": 9912,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 27.0,
   "homes_equivalent": 9800,
   "status": "Awaiting Construction",
   "consented": "2025-02-17",
   "refused": null,
   "planning_authority": "East Suffolk",
   "planning_ref": "DC/22/3313/FUL",
   "operator": "Pathfinder Clean Energy UK Dev Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-02-17",
     "years_since_consent": 1.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Station Road, Tivetshall St Margaret - Solar PV Panels",
   "repd_ref_id": 16035,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 20.0,
   "homes_equivalent": 7300,
   "status": "Awaiting Construction",
   "consented": "2025-06-30",
   "refused": null,
   "planning_authority": "South Norfolk",
   "planning_ref": "2024/3817",
   "operator": "Pathfinder Clean Energy UK Dev Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-06-30",
     "years_since_consent": 1.1
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Wissett Solar Farm, Wissett - Battery Storage  (Apple Tree)",
   "repd_ref_id": 9913,
   "technology": "Battery",
   "capacity_mw": 10.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-02-17",
   "refused": null,
   "planning_authority": "East Suffolk",
   "planning_ref": "DC/22/3313/FUL",
   "operator": "Pathfinder Clean Energy UK Dev Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-02-17",
     "years_since_consent": 1.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Suggenhall Farm - Photovoltaic Solar Array & Battery Storage",
   "repd_ref_id": 10164,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 7.3,
   "homes_equivalent": 2700,
   "status": "Awaiting Construction",
   "consented": "2024-04-17",
   "refused": "2022-08-03",
   "planning_authority": "Mid Suffolk",
   "planning_ref": "DC/21/06825",
   "operator": "RNA Energy Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 2 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-04-17",
     "years_since_consent": 2.3
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Gressingham Foods, Hinderclay Road - Solar Array",
   "repd_ref_id": 16535,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 3.5,
   "homes_equivalent": 1300,
   "status": "Awaiting Construction",
   "consented": "2024-11-11",
   "refused": null,
   "planning_authority": "Mid Suffolk",
   "planning_ref": "DC/24/02233",
   "operator": "Centrica Business Solutions UK Ltd",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-11-11",
     "years_since_consent": 1.7
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "V C Cooke, Ellough Road - Energy Recovery Facility",
   "repd_ref_id": 12680,
   "technology": "EfW Incineration",
   "capacity_mw": 2.5,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2023-04-27",
   "refused": null,
   "planning_authority": "East Suffolk",
   "planning_ref": "SCC/0063/22W",
   "operator": "VC Cooke & Son Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-04-27",
     "years_since_consent": 3.3
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Cranswick Country Foods",
   "repd_ref_id": 8436,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 1.5,
   "homes_equivalent": 500,
   "status": "Awaiting Construction",
   "consented": "2021-04-29",
   "refused": null,
   "planning_authority": "Mid Suffolk",
   "planning_ref": "DC/21/00610",
   "operator": "Cranswick Plc",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 5 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2021-04-29",
     "years_since_consent": 5.3
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Farmers Industrial Estate,Mill Road - Solar PV Systems",
   "repd_ref_id": 13817,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 1.2,
   "homes_equivalent": 400,
   "status": "Awaiting Construction",
   "consented": "2024-04-03",
   "refused": null,
   "planning_authority": "South Norfolk",
   "planning_ref": "2023/0655",
   "operator": "Zestec Renewable Energy",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 2 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-04-03",
     "years_since_consent": 2.3
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001156",
  "E14001530",
  "E14001146",
  "E14001344",
  "E14001497",
  "E14001489",
  "E14001365"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}