No.241 of 650 · approved, not built MP: Kevin Hollinrake (Conservative) England

Thirsk and Malton

Thirsk and Malton has 7.2 MW of clean power (mostly solar) approved and still not built: enough to supply a year's electricity to 4,100 homes. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. That cost is shared across every bill in Britain, so households here pay for it too: about £92 a year per household, £4.0m across the constituency's 43,580 homes.

Not visible
here
No big wind farm on the national grid is mapped to this constituency, so no switch-off payments show here in national data. Smaller wind farms on the local grid can still be paid to switch off — invisibly. The £ figure for this seat is a floor, not a zero.
7.2 MW
of clean power — mostly solar — approved and still not built, enough to supply a year's electricity to 4,100 homes. Approved at least two years ago; waiting on the grid, not on planning. That is 0.4× the renewable capacity actually running here.
14 projects · 4.3 MW solar, 2.9 MW onshore wind · planning database (REPD), July 2026 · how we worked this out
£4.0m
is what the grid gap costs this constituency's 43,580 households in a year between them — £92 each, about 51 days of one home's electricity.
The £92 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

6 of 14 waiting projects · years since approval
Fosters Wold Farm, Weaverthorpe - Solar PV Array
4.3 YRS
Vale Of Mowbray Limited - Solar Photovoltaic System 1 MW
4.1 YRS
Duggleby Wold Farmhouse - Wind Turbine 0.2 MW
3.7 YRS
Boythorpe Farm - Wind Turbines 1.3 MW
3.7 YRS
Cranswick Gourmet Pastry, Hugden Way - Solar Panels 0.7 MW
3.6 YRS
Forum Subsea Technologies, Ings Lane - Solar PV System 0.2 MW
3.6 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Boythorpe Farm - Wind TurbinesWind Onshore1,200 homes1.3 MW2022-123.7 yrs
Allison Wold Farm, Simon Howe - Wind Farm RepoweringWind Onshore1,100 homes1.3 MW2023-063.2 yrs
Vale Of Mowbray Limited - Solar Photovoltaic SystemSolar Photovoltaics400 homes1.0 MW2022-064.1 yrs
Haven Leisure, Primrose Avenue - Solar PanelsSolar Photovoltaics200 homes0.7 MW2023-043.3 yrs
Cranswick Gourmet Pastry, Hugden Way - Solar PanelsSolar Photovoltaics200 homes0.7 MW2022-123.6 yrs
Marshall aerospace, Kirkbymoorside - Solar PanelsSolar Photovoltaics200 homes0.5 MW2024-012.6 yrs
Deep Sea Electronics, Bridlington - Solar PanelsSolar Photovoltaics100 homes0.4 MW2024-022.4 yrs
Duggleby Wold Farmhouse - Wind TurbineWind Onshore200 homes0.2 MW2022-113.7 yrs
Reighton Sands Holiday Village, Sands Road - Solar PanelsSolar Photovoltaics100 homes0.2 MW2023-043.3 yrs
Filey Waste Water Treatment Works, Carr House Farm - Solar ArraySolar Photovoltaics100 homes0.2 MW2023-102.8 yrs
Malton Wastewater Treatment Works, Seven Lane Solar PanelsSolar Photovoltaics100 homes0.2 MW2023-112.7 yrs
Forum Subsea Technologies, Ings Lane - Solar PV SystemSolar Photovoltaics100 homes0.2 MW2023-013.6 yrs
Cedar Retreats, West Tanfield - Solar PanelsSolar Photovoltaics100 homes0.2 MW2024-012.5 yrs
Fosters Wold Farm, Weaverthorpe - Solar PV ArraySolar Photovoltaics— MW2022-044.3 yrs

Plus 9 more approved within the last two years.

Batteries

projects of 10 MW and above · planning database, July 2026 · what batteries do →
SiteSizeStatusWhile discharging
Third Energy UK Gas Limited - Battery Energy Storage100 MWapproved, not built 2021could supply ≈350,000 homes
Windmill Farm Solar Farm (Old Malton)13 MWapproved, not built 2025could supply ≈44,000 homes

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →

What has Kevin Hollinrake said about the grid in Parliament? Search Hansard →

See the full league table Data (JSON)