 "pcon24cd": "E14001544",
 "name": "Thirsk and Malton",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 0.0,
   "sites": 0
  }
 },
 "number2": {
  "stuck_mw": 7.2,
  "stuck_mw_int": 7,
  "stuck_sites": 14,
  "homes_equivalent": 4100,
  "homes_vs_seat_households": 0.09,
  "stuck_mw_12m_cut": 38.0,
  "consented_not_built_mw_any_age": 39.9,
  "operational_mw": 20.2,
  "operational_homes_equivalent": 7300,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 2.4,
  "rank": 241,
  "tech_mix": {
   "solar": 4.3,
   "onshore wind": 2.9
  },
  "tech_summary": "mostly solar",
  "waiting_vs_running": 0.4,
  "projects": [
   {
    "site_name": "Windmill Farm  Solar Farm (Old Malton)",
    "repd_ref_id": 8347,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 30.4,
    "homes_equivalent": 11000,
    "consented": "2025-02-26",
    "months_waiting": 17.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Boythorpe Farm - Wind Turbines",
    "repd_ref_id": 12505,
    "technology": "Wind Onshore",
    "capacity_mw": 1.3,
    "homes_equivalent": 1200,
    "consented": "2022-12-01",
    "months_waiting": 44.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Allison Wold Farm, Simon Howe - Wind Farm Repowering",
    "repd_ref_id": 13473,
    "technology": "Wind Onshore",
    "capacity_mw": 1.3,
    "homes_equivalent": 1100,
    "consented": "2023-06-01",
    "months_waiting": 38.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Vale Of Mowbray Limited - Solar Photovoltaic System",
    "repd_ref_id": 9164,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 1.0,
    "homes_equivalent": 400,
    "consented": "2022-06-16",
    "months_waiting": 49.6,
    "status": "Under Construction"
   },
   {
    "site_name": "Haven Leisure, Primrose Avenue - Solar Panels",
    "repd_ref_id": 13405,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.7,
    "homes_equivalent": 200,
    "consented": "2023-04-12",
    "months_waiting": 39.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Cranswick Gourmet Pastry, Hugden Way - Solar Panels",
    "repd_ref_id": 12616,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.7,
    "homes_equivalent": 200,
    "consented": "2022-12-09",
    "months_waiting": 43.8,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Ling Farm, Langtoft - Wind Turbines",
    "repd_ref_id": 19968,
    "technology": "Wind Onshore",
    "capacity_mw": 0.5,
    "homes_equivalent": 400,
    "consented": "2026-02-18",
    "months_waiting": 5.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Marshall aerospace, Kirkbymoorside - Solar Panels",
    "repd_ref_id": 15467,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.5,
    "homes_equivalent": 200,
    "consented": "2024-01-16",
    "months_waiting": 30.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Linton Mill, Main Street - Solar Panels",
    "repd_ref_id": 17975,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.5,
    "homes_equivalent": 200,
    "consented": "2025-03-06",
    "months_waiting": 16.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Deep Sea Electronics, Bridlington - Solar Panels",
    "repd_ref_id": 15622,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.4,
    "homes_equivalent": 100,
    "consented": "2024-02-21",
    "months_waiting": 29.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Park Farm, High Street - Wind Turbine",
    "repd_ref_id": 19479,
    "technology": "Wind Onshore",
    "capacity_mw": 0.2,
    "homes_equivalent": 200,
    "consented": "2025-11-06",
    "months_waiting": 8.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Bartindale Road, Grindale - Wind Turbine",
    "repd_ref_id": 19866,
    "technology": "Wind Onshore",
    "capacity_mw": 0.2,
    "homes_equivalent": 200,
    "consented": "2025-11-14",
    "months_waiting": 8.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Duggleby Wold Farmhouse - Wind Turbine",
    "repd_ref_id": 11734,
    "technology": "Wind Onshore",
    "capacity_mw": 0.2,
    "homes_equivalent": 200,
    "consented": "2022-11-23",
    "months_waiting": 44.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Gara Farm, Weaverthorpe - Wind Turbine",
    "repd_ref_id": 20039,
    "technology": "Wind Onshore",
    "capacity_mw": 0.2,
    "homes_equivalent": 200,
    "consented": "2026-04-13",
    "months_waiting": 3.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Reighton Sands Holiday Village, Sands Road - Solar Panels",
    "repd_ref_id": 13394,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2023-04-12",
    "months_waiting": 39.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Filey Waste Water Treatment Works, Carr House Farm - Solar Array",
    "repd_ref_id": 13685,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2023-10-06",
    "months_waiting": 33.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Malton Wastewater Treatment Works, Seven Lane Solar Panels",
    "repd_ref_id": 14183,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2023-11-27",
    "months_waiting": 32.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Forum Subsea Technologies, Ings Lane - Solar PV System",
    "repd_ref_id": 12883,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2023-01-05",
    "months_waiting": 42.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Cat Babbleton Farm, Ganton - Wind Turbine",
    "repd_ref_id": 19956,
    "technology": "Wind Onshore",
    "capacity_mw": 0.2,
    "homes_equivalent": 200,
    "consented": "2026-02-13",
    "months_waiting": 5.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Cross Thorns Farm, Pasture Road - Wind Turbine",
    "repd_ref_id": 20276,
    "technology": "Wind Onshore",
    "capacity_mw": 0.2,
    "homes_equivalent": 200,
    "consented": "2026-05-14",
    "months_waiting": 2.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Cedar Retreats, West Tanfield - Solar Panels",
    "repd_ref_id": 15914,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2024-01-24",
    "months_waiting": 30.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Malton And Norton District Hospital, Hospital Road -  Solar Panels",
    "repd_ref_id": 20127,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2026-01-30",
    "months_waiting": 6.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Fosters Wold Farm, Weaverthorpe - Solar PV Array",
    "repd_ref_id": 10444,
    "technology": "Solar Photovoltaics",
    "capacity_mw": null,
    "homes_equivalent": null,
    "consented": "2022-04-19",
    "months_waiting": 51.5,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 43580,
  "seat_total_gbp": 4000000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0.0,
  "building_mw": 0.0,
  "approved_mw": 117.6,
  "approved_24m_mw": 105.0,
  "refused_mw": 0.0,
  "submitted_mw": 0.0,
  "sites": [
   {
    "site_name": "Third Energy UK Gas Limited - Battery Energy Storage",
    "capacity_mw": 100.0,
    "status": "approved",
    "year": 2021,
    "homes_while_discharging": 350000
   },
   {
    "site_name": "Windmill Farm Solar Farm (Old Malton)",
    "capacity_mw": 12.6,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 44000
   },
   {
    "site_name": "Showfield Lane",
    "capacity_mw": 5.0,
    "status": "approved",
    "year": 2019,
    "homes_while_discharging": 18000
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Third Energy UK Gas Limited - Battery Energy Storage",
   "repd_ref_id": 9691,
   "technology": "Battery",
   "capacity_mw": 100.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2021-10-14",
   "refused": null,
   "planning_authority": "North Yorkshire",
   "planning_ref": "21/01220/FUL",
   "operator": "Third Energy",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 5 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2021-10-14",
     "years_since_consent": 4.8
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Windmill Farm  Solar Farm (Old Malton)",
   "repd_ref_id": 8347,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 30.4,
   "homes_equivalent": 11000,
   "status": "Awaiting Construction",
   "consented": "2025-02-26",
   "refused": "2023-10-17",
   "planning_authority": "North Yorkshire",
   "planning_ref": "23/00046/MFULE",
   "operator": "Harmony Energy",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-02-26",
     "years_since_consent": 1.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Stell Solar Farm",
   "repd_ref_id": 18911,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 30.0,
   "homes_equivalent": 11000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "North Yorkshire",
   "planning_ref": "ZB25/01246/FUL",
   "operator": "Enviromena",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 12 months for a planning decision",
    "who": "North Yorkshire Council",
    "evidence": {
     "submitted": "2025-07-24",
     "months_waiting": 12
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Windmill Farm Solar Farm (Old Malton)",
   "repd_ref_id": 8348,
   "technology": "Battery",
   "capacity_mw": 12.6,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-02-25",
   "refused": "2023-10-17",
   "planning_authority": "North Yorkshire",
   "planning_ref": "23/00046/MFULE",
   "operator": "Harmony Energy",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-02-25",
     "years_since_consent": 1.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Land to the South of Knapton Quarry Landfill Site",
   "repd_ref_id": 6656,
   "technology": "EfW Incineration",
   "capacity_mw": 9.9,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2018-08-01",
   "refused": null,
   "planning_authority": "North Yorkshire",
   "planning_ref": "NY/2016/0194/ENV",
   "operator": "Knapton Green Energy (Tetragen and NCG Estates) / Third Energy",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 8 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2018-08-01",
     "years_since_consent": 8.0
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Showfield Lane",
   "repd_ref_id": 7171,
   "technology": "Battery",
   "capacity_mw": 5.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2019-02-06",
   "refused": null,
   "planning_authority": "North Yorkshire",
   "planning_ref": "18/01288/FUL",
   "operator": "Enstor Energy",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 7 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2019-02-06",
     "years_since_consent": 7.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Boythorpe Farm - Wind Turbines",
   "repd_ref_id": 12505,
   "technology": "Wind Onshore",
   "capacity_mw": 1.3,
   "homes_equivalent": 1200,
   "status": "Awaiting Construction",
   "consented": "2022-12-01",
   "refused": null,
   "planning_authority": "North Yorkshire",
   "planning_ref": "22/01092/FUL",
   "operator": "Allison Wold Power",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-12-01",
     "years_since_consent": 3.7
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Allison Wold Farm, Simon Howe - Wind Farm Repowering",
   "repd_ref_id": 13473,
   "technology": "Wind Onshore",
   "capacity_mw": 1.3,
   "homes_equivalent": 1100,
   "status": "Awaiting Construction",
   "consented": "2023-06-01",
   "refused": null,
   "planning_authority": "North Yorkshire",
   "planning_ref": "23/00222/FUL",
   "operator": "Allison Wold Power Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-06-01",
     "years_since_consent": 3.2
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Vale Of Mowbray Limited - Solar Photovoltaic System",
   "repd_ref_id": 9164,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 1.0,
   "homes_equivalent": 400,
   "status": "Under Construction",
   "consented": "2022-06-16",
   "refused": null,
   "planning_authority": "North Yorkshire",
   "planning_ref": "21/01235/SPN",
   "operator": "Vale of Mowbray Limited",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001127",
  "E14001461",
  "E14001250",
  "E14001605",
  "E14001582",
  "E14001444",
  "E14001475"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}