South Shropshire

South Shropshire has 112 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 41,000 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.9m across the constituency's 41,990 homes.

Not visible
here
No big wind farm on the national grid is mapped to this constituency, so no switch-off payments show here in national data. Smaller wind farms on the local grid can still be paid to switch off — invisibly. The £ figure for this seat is a floor, not a zero.
112 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 41,000 homes — about as many homes as this constituency has. Approved at least two years ago; waiting on the grid, not on planning. That is 1.4× the renewable capacity actually running here.
6 projects · planning database (REPD), July 2026 · how we worked this out
£3.9m
is what the grid gap costs this constituency's 41,990 households in a year between them — £92 each, about 51 days of one home's electricity.
The £92 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

3 of 6 waiting projects · years since approval
Brick House Farm - Solar Farm 50 MW
3.8 YRS
Rock Farm - Solar Farm 40 MW
2.9 YRS
Kemberton - Solar Farm 22 MW
2.4 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Brick House Farm - Solar FarmSolar Photovoltaics18,000 homes49.9 MW2022-103.8 yrs
Rock Farm - Solar FarmSolar Photovoltaics15,000 homes40.0 MW2023-092.9 yrs
Kemberton - Solar FarmSolar Photovoltaics8,000 homes22.0 MW2024-022.4 yrs
Sainsburys Supermarkets, Dun Cow Road - Solar PanelsSolar Photovoltaics100 homes0.2 MW2023-102.8 yrs
Syspal, Cockshutt Lane - Solar PanelsSolar Photovoltaics100 homes0.2 MW2023-013.5 yrs
Bridgnorth Garden Centre - Storage WarehouseSolar Photovoltaics— MW2023-033.3 yrs

Plus 4 more approved within the last two years.

Batteries

projects of 10 MW and above · planning database, July 2026 · what batteries do →
SiteSizeStatusWhile discharging
Buildwas - Battery Energy Storage100 MWapproved, not built 2026could supply ≈350,000 homes
Pelham Road, Upton Magna - Battery Energy Storage System100 MWcould supply ≈350,000 homes
Hollydale, Buildwas Road - Battery Storage40 MWapproved, not built 2024could supply ≈140,000 homes
Steventon Road - Battery Energy Storage23 MWapproved, not built 2024could supply ≈81,000 homes
Rock Farm - Solar Farm12 MWbeing built 2023could supply ≈42,000 homes

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →

What has Stuart Anderson said about the grid in Parliament? Search Hansard →

See the full league table Data (JSON)