No.29 of 650 · approved, not built MP: James Naish (Labour) England

Rushcliffe

Rushcliffe has 163 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 59,000 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.9m across the constituency's 42,128 homes.

Not visible
here
No big wind farm on the national grid is mapped to this constituency, so no switch-off payments show here in national data. Smaller wind farms on the local grid can still be paid to switch off — invisibly. The £ figure for this seat is a floor, not a zero.
163 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 59,000 homes — about as many homes as this constituency has. Approved at least two years ago; waiting on the grid, not on planning. That is 6.7× the renewable capacity actually running here.
12 projects · planning database (REPD), July 2026 · how we worked this out
£3.9m
is what the grid gap costs this constituency's 42,128 households in a year between them — £92 each, about 51 days of one home's electricity.
The £92 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

3 of 12 waiting projects · years since approval
Church Farm, Kingston On Soar - Solar Photovoltaic Farm 50 MW
3.6 YRS
Highfields Farm - Solar Farm & Battery Storage 43 MW
3.5 YRS
Fair Oaks Renewable Energy Park - Solar farm & Battery energy storage 50 MW
2.8 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Church Farm, Kingston On Soar - Solar Photovoltaic FarmSolar Photovoltaics18,000 homes49.9 MW2022-123.6 yrs
Fair Oaks Renewable Energy Park - Solar farm & Battery energy storageSolar Photovoltaics18,000 homes49.9 MW2023-102.8 yrs
Highfields Farm - Solar Farm & Battery StorageSolar Photovoltaics16,000 homes42.9 MW2023-023.5 yrs
Ratcliffe On Soar Power Station - Solar FarmSolar Photovoltaics3,300 homes9.0 MW2023-073.0 yrs
Sharpley Hill Solar FarmSolar Photovoltaics1,500 homes4.2 MW2021-124.7 yrs
Radcliffe Road, Holme Pierrepont - Solar FarmSolar Photovoltaics1,500 homes4.2 MW2022-123.6 yrs
Monarch Education Furniture - Solar panelsSolar Photovoltaics300 homes0.9 MW2024-032.4 yrs
British Geological, Keywork Solar PanelsSolar Photovoltaics200 homes0.6 MW2021-015.5 yrs
Frontier Agriculture, Ruddington - Solar PVSolar Photovoltaics200 homes0.5 MW2023-033.4 yrs
Wells Agriculture Barn Farm, Flawforth Lane - Solar PV SystemSolar Photovoltaics100 homes0.3 MW2023-033.4 yrs
David Lloyd Leisure Health and Fitness Club, Rugby Road - Solar panelsSolar Photovoltaics100 homes0.3 MW2024-032.4 yrs
Ideagen, Mere Way - Solar PanelsSolar Photovoltaics100 homes0.1 MW2023-063.1 yrs

Plus 7 more approved within the last two years.

Batteries

projects of 10 MW and above · planning database, July 2026 · what batteries do →
SiteSizeStatusWhile discharging
West Leake Lane, Ratcliffe - Battery Storage1,200 MWapproved, not built 2025could supply ≈4,205,000 homes
Gotham - Battery Energy storage100 MWcould supply ≈350,000 homes
West Leake Lane, Ratcliffe - Battery Storage100 MWapproved, not built 2025could supply ≈350,000 homes
Old Wood Energy Park - Battery Energy Storage85 MWapproved, not built 2026could supply ≈298,000 homes
Fair Oaks Renewable Energy Park - Solar farm & Battery energy storage50 MWapproved, not built 2023could supply ≈175,000 homes
West Thorpe Church Farm, Willoughby On The Wolds - Battery Energy Storage25 MWapproved, not built 2024could supply ≈88,000 homes
Heron Solar Farm & Battery Storage20 MWapproved, not built 2024could supply ≈70,000 homes

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →

What has James Naish said about the grid in Parliament? Search Hansard →

See the full league table Data (JSON)