No.223 of 650 · approved, not built MP: Alison Taylor (Labour) Scotland

Paisley and Renfrewshire North

Paisley and Renfrewshire North has 15 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 5,600 homes. Britain's grid bottlenecks still add to bills here: about £116 a year per household, £5.0m across the constituency's 43,222 homes. A 50 MW battery was refused planning here in 2024; while discharging it could have supplied about 175,000 homes.

Not visible
here
No big wind farm on the national grid is mapped to this constituency, so no switch-off payments show here in national data. Smaller wind farms on the local grid can still be paid to switch off — invisibly. The £ figure for this seat is a floor, not a zero.
15 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 5,600 homes. Approved at least two years ago; waiting on the grid, not on planning. That is 0.8× the renewable capacity actually running here.
5 projects · planning database (REPD), July 2026 · how we worked this out
£5.0m
is what the grid gap costs this constituency's 43,222 households in a year between them — £116 each, about 65 days of one home's electricity.
The £116 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

5 of 5 waiting projects · years since approval
East Fulwood Greenock Road - Solar Farm 14 MW
3.8 YRS
Cartside Avenue, Inchinnan - Solar Panels 0.2 MW
3.8 YRS
Fifty Pitches Place - Solar Panels 0.5 MW
2.9 YRS
Cpi Medicines Manufacturing Centre, Netherton Square - Solar Panels 0.2 MW
2.8 YRS
Decathlon, Old Govan Road - Solar Panels 0.2 MW
2.6 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
East Fulwood Greenock Road - Solar FarmSite Between Nether Southbar And East Fulwood Greenock Road, InchinnanSolar Photovoltaics5,200 homes14.3 MW2023-013.8 yrs
Fifty Pitches Place - Solar Panels110 Fifty Pitches Place GlasgowSolar Photovoltaics200 homes0.5 MW2023-122.9 yrs
Cartside Avenue, Inchinnan - Solar Panels1 Cartside Avenue InchinnanSolar Photovoltaics100 homes0.2 MW2023-023.8 yrs
Cpi Medicines Manufacturing Centre, Netherton Square - Solar PanelsCpi Medicines Manufacturing Innovation Centre, 1 Netherton Square, PaisleySolar Photovoltaics100 homes0.2 MW2024-012.8 yrs
Decathlon, Old Govan Road - Solar PanelsDecathlon, Old Govan Road, RenfrewSolar Photovoltaics100 homes0.2 MW2024-032.6 yrs

Plus 1 more approved within the last two years.

Batteries

projects of 10 MW and above · planning database, July 2026 · what batteries do →
SiteSizeStatusWhile discharging
East Fulwood Energy Storage400 MWcould supply ≈1,402,000 homes
Barnwell, Wright Street - Battery Energy Storage50 MWrefused 2024could supply ≈175,000 homes
Laigh Park Water Treatment Works - Battery Energy Storage System50 MWcould supply ≈173,000 homes
Land off Shilton Lane40 MWoperatingcould supply ≈140,000 homes
Land SW of Shilton Cottage30 MWoperatingcould supply ≈105,000 homes

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →