No.94 of 650 · approved, not built MP: Richard Fuller (Conservative) England

North Bedfordshire

North Bedfordshire has 74 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 27,000 homes. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. That cost is shared across every bill in Britain, so households here pay for it too: about £92 a year per household, £3.9m across the constituency's 42,897 homes.

Not visible
here
8.6 MW of wind is running in this constituency, but it sits on the local network rather than the national grid — so if it is paid to switch off, no national record shows it. That is why this seat has no figure here: not because nothing happens, but because nobody publishes it. The £ figure for this seat is a floor, not a zero.
74 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 27,000 homes. Approved at least two years ago; waiting on the grid, not on planning. That is 0.8× the renewable capacity actually running here.
9 projects · planning database (REPD), July 2026 · how we worked this out
£3.9m
is what the grid gap costs this constituency's 42,897 households in a year between them — £92 each, about 51 days of one home's electricity.
The £92 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

3 of 9 waiting projects · years since approval
Goosey Lodge - Solar Farm 10 MW
3.2 YRS
Gooseys Lodge, Wymington Lane - Solar Farm 10 MW
2.2 YRS
Snakes Meadow - Solar Farm 46 MW
2.2 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Snakes Meadow - Solar FarmSolar Photovoltaics17,000 homes45.5 MW2024-052.2 yrs
Goosey Lodge - Solar FarmSolar Photovoltaics3,800 homes10.5 MW2023-053.2 yrs
Gooseys Lodge, Wymington Lane - Solar FarmSolar Photovoltaics3,800 homes10.4 MW2024-052.2 yrs
Clapham Plateau - Solar FarmSolar Photovoltaics2,000 homes5.5 MW2023-013.5 yrs
Oakley Primary Academy, Station Road - Solar Panels & ASHPSolar Photovoltaics600 homes1.6 MW2023-023.4 yrs
Towers Health And Racquets Club, Clapham Road - Solar PanelsSolar Photovoltaics100 homes0.3 MW2023-053.2 yrs
Old Warden Aerodrome, Old Warden Park - Solar PanelsSolar Photovoltaics100 homes0.2 MW2024-012.5 yrs
G And M Growers, Hitchin Road - Solar Photovoltaics PanelsSolar Photovoltaics100 homes0.2 MW2023-023.4 yrs
Stratton Business Park, Pegasus Drive - Solar PanelsSolar Photovoltaics— MW2024-052.2 yrs

Plus 6 more approved within the last two years.

Batteries

projects of 10 MW and above · planning database, July 2026 · what batteries do →
SiteSizeStatusWhile discharging
Dunton Lane - Battery Energy Storage System200 MWapproved, not built 2025could supply ≈701,000 homes
Dunton Lane - Battery Energy Storage System177 MWapproved, not built 2025could supply ≈620,000 homes
Cobholden Battery Storage100 MWapproved, not built 2023could supply ≈350,000 homes
Thurleigh Road - Battery Energy Storage69 MWapproved, not built 2024could supply ≈242,000 homes
Moggerhanger Road, Sandy - Solar Farm20 MWcould supply ≈70,000 homes
Bedford Solar, Northill Road - Solar Farm & Battery Storage15 MWcould supply ≈53,000 homes

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →

What has Richard Fuller said about the grid in Parliament? Search Hansard →

See the full league table Data (JSON)