 "pcon24cd": "E14001384",
 "name": "North Bedfordshire",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 8.6,
   "sites": 1
  }
 },
 "number2": {
  "stuck_mw": 74.2,
  "stuck_mw_int": 74,
  "stuck_sites": 9,
  "homes_equivalent": 27000,
  "homes_vs_seat_households": 0.63,
  "stuck_mw_12m_cut": 124.8,
  "consented_not_built_mw_any_age": 201.2,
  "operational_mw": 97.0,
  "operational_homes_equivalent": 40000,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.9,
  "median_months_to_decision": 5.1,
  "rank": 94,
  "tech_mix": {
   "solar": 74.2
  },
  "tech_summary": "all solar",
  "waiting_vs_running": 0.8,
  "projects": [
   {
    "site_name": "Cobholden Solar Farm",
    "repd_ref_id": 9479,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 49.9,
    "homes_equivalent": 18000,
    "consented": "2025-01-30",
    "months_waiting": 18.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Twinwood Road Oakley And Clapham, Thurleigh Road - Solar Farm",
    "repd_ref_id": 19369,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 49.9,
    "homes_equivalent": 18000,
    "consented": "2026-02-19",
    "months_waiting": 5.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Snakes Meadow - Solar Farm",
    "repd_ref_id": 9820,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 45.5,
    "homes_equivalent": 17000,
    "consented": "2024-05-08",
    "months_waiting": 26.8,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Lowfield Farm - Solar Farm",
    "repd_ref_id": 16062,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 26.5,
    "homes_equivalent": 9600,
    "consented": "2025-11-03",
    "months_waiting": 9.0,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Goosey Lodge - Solar Farm",
    "repd_ref_id": 11923,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 10.5,
    "homes_equivalent": 3800,
    "consented": "2023-05-25",
    "months_waiting": 38.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Gooseys Lodge, Wymington Lane - Solar Farm",
    "repd_ref_id": 15707,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 10.4,
    "homes_equivalent": 3800,
    "consented": "2024-05-02",
    "months_waiting": 27.0,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Clapham Plateau - Solar Farm",
    "repd_ref_id": 11699,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 5.5,
    "homes_equivalent": 2000,
    "consented": "2023-01-25",
    "months_waiting": 42.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Oakley Primary Academy, Station Road - Solar Panels & ASHP",
    "repd_ref_id": 12231,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 1.6,
    "homes_equivalent": 600,
    "consented": "2023-02-22",
    "months_waiting": 41.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Towers Health And Racquets Club, Clapham Road - Solar Panels",
    "repd_ref_id": 13495,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2023-05-09",
    "months_waiting": 38.8,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Sainsbury, Bells Brook - Solar Panels",
    "repd_ref_id": 18263,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2025-03-26",
    "months_waiting": 16.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Old Warden Aerodrome, Old Warden Park - Solar Panels",
    "repd_ref_id": 15512,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2024-01-26",
    "months_waiting": 30.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Eyeworth Lodge Farm, Eyeworth - Wind Turbine",
    "repd_ref_id": 16651,
    "technology": "Wind Onshore",
    "capacity_mw": 0.2,
    "homes_equivalent": 200,
    "consented": "2025-03-14",
    "months_waiting": 16.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "G And M Growers, Hitchin Road - Solar Photovoltaics Panels",
    "repd_ref_id": 12946,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2023-02-22",
    "months_waiting": 41.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Bassmead Manor Farm, Staploe - Solar Panels",
    "repd_ref_id": 17567,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2025-03-27",
    "months_waiting": 16.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Stratton Business Park, Pegasus Drive - Solar Panels",
    "repd_ref_id": 16134,
    "technology": "Solar Photovoltaics",
    "capacity_mw": null,
    "homes_equivalent": null,
    "consented": "2024-05-09",
    "months_waiting": 26.8,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 42897,
  "seat_total_gbp": 3900000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0.0,
  "building_mw": 0.0,
  "approved_mw": 546.0,
  "approved_24m_mw": 169.0,
  "refused_mw": 0.8,
  "submitted_mw": 35.0,
  "sites": [
   {
    "site_name": "Dunton Lane - Battery Energy Storage System",
    "capacity_mw": 200.0,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 701000
   },
   {
    "site_name": "Dunton Lane - Battery Energy Storage System",
    "capacity_mw": 177.0,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 620000
   },
   {
    "site_name": "Cobholden Battery Storage",
    "capacity_mw": 100.0,
    "status": "approved",
    "year": 2023,
    "homes_while_discharging": 350000
   },
   {
    "site_name": "Thurleigh Road - Battery Energy Storage",
    "capacity_mw": 69.0,
    "status": "approved",
    "year": 2024,
    "homes_while_discharging": 242000
   },
   {
    "site_name": "Moggerhanger Road, Sandy - Solar Farm",
    "capacity_mw": 20.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 70000
   },
   {
    "site_name": "Bedford Solar, Northill Road - Solar Farm & Battery Storage",
    "capacity_mw": 15.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 53000
   },
   {
    "site_name": "Allotment Gardens, Ridge Road - Micro Energy Storage System",
    "capacity_mw": 0.8,
    "status": "refused",
    "year": 2024,
    "homes_while_discharging": 2800
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Dunton Lane - Battery Energy Storage System",
   "repd_ref_id": 17651,
   "technology": "Battery",
   "capacity_mw": 200.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-07-21",
   "refused": null,
   "planning_authority": "Central Bedfordshire",
   "planning_ref": "CB/24/03111/FULL",
   "operator": "Harmony BW Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-07-21",
     "years_since_consent": 1.0
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Dunton Lane - Battery Energy Storage System",
   "repd_ref_id": 17482,
   "technology": "Battery",
   "capacity_mw": 177.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-10-24",
   "refused": null,
   "planning_authority": "Central Bedfordshire",
   "planning_ref": "CB/25/00421/REG3",
   "operator": "Central Bedfordshire Council",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-10-24",
     "years_since_consent": 0.8
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Cobholden Battery Storage",
   "repd_ref_id": 12076,
   "technology": "Battery",
   "capacity_mw": 100.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2023-05-04",
   "refused": null,
   "planning_authority": "Bedford",
   "planning_ref": "22/01828/MAF",
   "operator": "AGR Renewables",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-05-04",
     "years_since_consent": 3.2
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Thurleigh Road - Battery Energy Storage",
   "repd_ref_id": 9651,
   "technology": "Battery",
   "capacity_mw": 69.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2024-01-30",
   "refused": null,
   "planning_authority": "Bedford",
   "planning_ref": "23/01139/MAF",
   "operator": "Pathfinder Clean Energy UK Dev Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-01-30",
     "years_since_consent": 2.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Cobholden Solar Farm",
   "repd_ref_id": 9479,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.9,
   "homes_equivalent": 18000,
   "status": "Awaiting Construction",
   "consented": "2025-01-30",
   "refused": null,
   "planning_authority": "Bedford",
   "planning_ref": "24/00858/MAF",
   "operator": "AGR Renewables",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-01-30",
     "years_since_consent": 1.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Bedford Solar, Northill Road - Solar Farm & Battery Storage",
   "repd_ref_id": 18335,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.9,
   "homes_equivalent": 18000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Bedford",
   "planning_ref": "25/01030/MAF",
   "operator": "QC Ubertino Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 14 months for a planning decision",
    "who": "Bedford Council",
    "evidence": {
     "submitted": "2025-06-04",
     "months_waiting": 14
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Twinwood Road Oakley And Clapham, Thurleigh Road - Solar Farm",
   "repd_ref_id": 19369,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.9,
   "homes_equivalent": 18000,
   "status": "Awaiting Construction",
   "consented": "2026-02-19",
   "refused": null,
   "planning_authority": "Bedford",
   "planning_ref": "25/01292/MAF",
   "operator": "PACE Elevate Energy Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2026-02-19",
     "years_since_consent": 0.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Snakes Meadow - Solar Farm",
   "repd_ref_id": 9820,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 45.5,
   "homes_equivalent": 17000,
   "status": "Awaiting Construction",
   "consented": "2024-05-08",
   "refused": null,
   "planning_authority": "Bedford",
   "planning_ref": "21/02526/MAF",
   "operator": "Renewable Connections Developments Limited / European Energy UK Ltd",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 2 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-05-08",
     "years_since_consent": 2.2
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Lowfield Farm - Solar Farm",
   "repd_ref_id": 16062,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 26.5,
   "homes_equivalent": 9600,
   "status": "Awaiting Construction",
   "consented": "2025-11-03",
   "refused": null,
   "planning_authority": "Central Bedfordshire",
   "planning_ref": "CB/24/03703/FULL",
   "operator": "Renewable Connections Developments Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-11-03",
     "years_since_consent": 0.7
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Moggerhanger Road, Sandy - Solar Farm",
   "repd_ref_id": 10981,
   "technology": "Battery",
   "capacity_mw": 20.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Central Bedfordshire",
   "planning_ref": "CB/22/00752/FULL",
   "operator": "Kach Capital Estates Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 4.4 years for a planning decision",
    "who": "Central Bedfordshire Council",
    "evidence": {
     "submitted": "2022-03-10",
     "months_waiting": 53
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Bedford Solar, Northill Road - Solar Farm & Battery Storage",
   "repd_ref_id": 18336,
   "technology": "Battery",
   "capacity_mw": 15.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Bedford",
   "planning_ref": "25/01030/MAF",
   "operator": "QC Ubertino Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 14 months for a planning decision",
    "who": "Bedford Council",
    "evidence": {
     "submitted": "2025-06-04",
     "months_waiting": 14
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Goosey Lodge - Solar Farm",
   "repd_ref_id": 11923,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 10.5,
   "homes_equivalent": 3800,
   "status": "Awaiting Construction",
   "consented": "2023-05-25",
   "refused": null,
   "planning_authority": "Bedford",
   "planning_ref": "22/01520/MAF",
   "operator": "Wykes Engineering Limited Goosey Lodge",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-05-25",
     "years_since_consent": 3.2
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Gooseys Lodge, Wymington Lane - Solar Farm",
   "repd_ref_id": 15707,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 10.4,
   "homes_equivalent": 3800,
   "status": "Awaiting Construction",
   "consented": "2024-05-02",
   "refused": null,
   "planning_authority": "Bedford",
   "planning_ref": "23/02517/MAF",
   "operator": "Wykes Engineering Limited Goosey Lodge",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 2 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-05-02",
     "years_since_consent": 2.3
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Moggerhanger Road, Sandy - Solar Farm",
   "repd_ref_id": 9349,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 7.0,
   "homes_equivalent": 2500,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Central Bedfordshire",
   "planning_ref": "CB/22/00752/FULL",
   "operator": "Kach Capital Estates Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 4.4 years for a planning decision",
    "who": "Central Bedfordshire Council",
    "evidence": {
     "submitted": "2022-03-10",
     "months_waiting": 53
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Clapham Plateau - Solar Farm",
   "repd_ref_id": 11699,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 5.5,
   "homes_equivalent": 2000,
   "status": "Awaiting Construction",
   "consented": "2023-01-25",
   "refused": null,
   "planning_authority": "Bedford",
   "planning_ref": "22/01581/MAF",
   "operator": "Sirius Renewable Energy",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-01-25",
     "years_since_consent": 3.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Oakley Primary Academy, Station Road - Solar Panels & ASHP",
   "repd_ref_id": 12231,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 1.6,
   "homes_equivalent": 600,
   "status": "Awaiting Construction",
   "consented": "2023-02-22",
   "refused": null,
   "planning_authority": "Bedford",
   "planning_ref": "22/02104/FUL",
   "operator": "Cambridge Meridian Academies Trust",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-02-22",
     "years_since_consent": 3.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001490",
  "E14001289",
  "E14001359",
  "E14001370",
  "E14001084",
  "E14001571",
  "E14001298",
  "E14001179",
  "E14001393",
  "E14001481",
  "E14001512"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}