Mid Dorset and North Poole
Mid Dorset and North Poole has 3.3 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 1,200 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.7m across the constituency's 40,506 homes.
here
The waiting list
Every approved, unbuilt project
| Site | Technology | Enough for | Capacity | Approved | Waiting |
|---|---|---|---|---|---|
| Whites Pit, Arena Way - Solar PV Array | Solar Photovoltaics | 700 homes | 2.0 MW | 2023-12 | 2.6 yrs |
| The Purbeck School - Solar panels | Solar Photovoltaics | 100 homes | 0.3 MW | 2021-11 | 4.7 yrs |
| Sandford Holiday Park, Organford Road - Solar Panels | Solar Photovoltaics | 100 homes | 0.2 MW | 2022-11 | 3.7 yrs |
| Canford School, Sports Centre - Solar Panels | Solar Photovoltaics | 100 homes | 0.2 MW | 2024-05 | 2.2 yrs |
| Birchwood Tourist Park, Bere Road - Solar PV Panels | Solar Photovoltaics | 100 homes | 0.2 MW | 2023-06 | 3.1 yrs |
| Sandford Road, Sandford - Solar Photovoltaics PV Equipment | Solar Photovoltaics | 100 homes | 0.2 MW | 2022-01 | 4.6 yrs |
| Big Yellow Self Storage, Nuffield Road - Solar Photovoltaic Panels | Solar Photovoltaics | 100 homes | 0.2 MW | 2022-10 | 3.8 yrs |
Plus 1 more approved within the last two years.
Batteries
| Site | Size | Status | While discharging |
|---|---|---|---|
| Mannington Battery Energy Storage System | 50 MW | being built 2021 | could supply ≈175,000 homes |
| Holt Road - Battery Energy Storage | 48 MW | approved, not built 2024 | could supply ≈166,000 homes |
| Post Farm, Lytchett Minster - Battery Energy Storage | 32 MW | approved, not built 2024 | could supply ≈112,000 homes |
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →
What has Vikki Slade said about the grid in Parliament? Search Hansard →