 "pcon24cd": "E14001363",
 "name": "Mid Dorset and North Poole",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 0.0,
   "sites": 0
  }
 },
 "number2": {
  "stuck_mw": 3.3,
  "stuck_mw_int": 3,
  "stuck_sites": 7,
  "homes_equivalent": 1200,
  "homes_vs_seat_households": 0.03,
  "stuck_mw_12m_cut": 3.5,
  "consented_not_built_mw_any_age": 3.5,
  "operational_mw": 89.7,
  "operational_homes_equivalent": 33000,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.3,
  "median_months_to_decision": 1.8,
  "rank": 293,
  "tech_mix": {
   "solar": 3.3
  },
  "tech_summary": "all solar",
  "waiting_vs_running": 0.0,
  "projects": [
   {
    "site_name": "Whites Pit, Arena Way - Solar PV Array",
    "repd_ref_id": 14974,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 2.0,
    "homes_equivalent": 700,
    "consented": "2023-12-19",
    "months_waiting": 31.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "The Purbeck School - Solar panels",
    "repd_ref_id": 9750,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2021-11-17",
    "months_waiting": 56.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Sandford Holiday Park, Organford Road - Solar Panels",
    "repd_ref_id": 12222,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2022-11-15",
    "months_waiting": 44.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Canford School, Sports Centre - Solar Panels",
    "repd_ref_id": 16118,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2024-05-23",
    "months_waiting": 26.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Birchwood Tourist Park, Bere Road - Solar PV Panels",
    "repd_ref_id": 13167,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2023-06-15",
    "months_waiting": 37.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Sandford Road, Sandford -  Solar Photovoltaics PV Equipment",
    "repd_ref_id": 10365,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2022-01-04",
    "months_waiting": 54.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Big Yellow Self Storage, Nuffield Road - Solar Photovoltaic Panels",
    "repd_ref_id": 12089,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2022-10-20",
    "months_waiting": 45.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "The Purbeck School, Worgret Road - Solar Photovoltaic Panels",
    "repd_ref_id": 18412,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.1,
    "homes_equivalent": 100,
    "consented": "2025-04-10",
    "months_waiting": 15.8,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 40506,
  "seat_total_gbp": 3700000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0.3,
  "building_mw": 49.9,
  "approved_mw": 79.5,
  "approved_24m_mw": 47.5,
  "refused_mw": 0.0,
  "submitted_mw": 0.0,
  "sites": [
   {
    "site_name": "Mannington Battery Energy Storage System",
    "capacity_mw": 49.9,
    "status": "building",
    "year": 2021,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "Holt Road - Battery Energy Storage",
    "capacity_mw": 47.5,
    "status": "approved",
    "year": 2024,
    "homes_while_discharging": 166000
   },
   {
    "site_name": "Post Farm, Lytchett Minster - Battery Energy Storage",
    "capacity_mw": 32.0,
    "status": "approved",
    "year": 2024,
    "homes_while_discharging": 112000
   },
   {
    "site_name": "Slepe Farm",
    "capacity_mw": 0.3,
    "status": "operating",
    "year": 2011,
    "homes_while_discharging": 1100
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Mannington Battery Energy Storage System",
   "repd_ref_id": 8833,
   "technology": "Battery",
   "capacity_mw": 49.9,
   "homes_equivalent": null,
   "status": "Under Construction",
   "consented": "2021-07-02",
   "refused": null,
   "planning_authority": "Dorset",
   "planning_ref": "3/21/0137/FUL",
   "operator": "EDF Energy Renewables",
   "reason": {
    "reason": "connection_date",
    "label": "Its grid connection date of 2025 has passed and it is still not generating",
    "who": "the grid operator (NESO) and National Grid",
    "evidence": {
     "project": "Mannington",
     "connection_date": "2025-11-30",
     "mw": 47.5,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "building"
    ]
   },
   "earliest": "2025",
   "tec": {
    "project": "Mannington",
    "connection_date": "2025-11-30",
    "connection_year": 2025,
    "mw": 47.5,
    "stage": null,
    "who": "the grid operator (NESO) and National Grid",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Holt Road - Battery Energy Storage",
   "repd_ref_id": 15470,
   "technology": "Battery",
   "capacity_mw": 47.5,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2024-07-29",
   "refused": null,
   "planning_authority": "Dorset",
   "planning_ref": "P/FUL/2023/06578",
   "operator": "EDF Energy Renewables",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 2 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-07-29",
     "years_since_consent": 2.0
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Post Farm, Lytchett Minster - Battery Energy Storage",
   "repd_ref_id": 10291,
   "technology": "Battery",
   "capacity_mw": 32.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2024-11-28",
   "refused": null,
   "planning_authority": "Dorset",
   "planning_ref": "P/FUL/2023/02819",
   "operator": "S4N Lytchett Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-11-28",
     "years_since_consent": 1.7
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Canford Resource Park- Energy from Waste/CHP",
   "repd_ref_id": 11157,
   "technology": "EfW Incineration",
   "capacity_mw": 30.0,
   "homes_equivalent": null,
   "status": "Application Refused",
   "consented": null,
   "refused": "2025-06-19",
   "planning_authority": "Bournemouth, Christchurch and Poole",
   "planning_ref": "APP/23/00822/F",
   "operator": "MVV Environment Limited",
   "reason": {
    "reason": "refused",
    "label": "Refused by Bournemouth, Christchurch and Poole Council in 2025",
    "who": "Bournemouth, Christchurch and Poole Council",
    "evidence": {
     "refusal_date": "2025-06-19"
    },
    "all_matches": [
     "refused"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Canford",
   "repd_ref_id": 956,
   "technology": "Advanced Conversion Technologies",
   "capacity_mw": 10.0,
   "homes_equivalent": null,
   "status": "Under Construction",
   "consented": "2013-07-01",
   "refused": null,
   "planning_authority": "Bournemouth, Christchurch and Poole",
   "planning_ref": "APP/12/01559/F",
   "operator": "Syngas Products/ Canford Renewable Energy Ltd",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Whites Pit, Arena Way - Solar PV Array",
   "repd_ref_id": 14974,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 2.0,
   "homes_equivalent": 700,
   "status": "Awaiting Construction",
   "consented": "2023-12-19",
   "refused": null,
   "planning_authority": "Bournemouth, Christchurch and Poole",
   "planning_ref": "APP/23/01002/F",
   "operator": "Canford Renewable Energy Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-12-19",
     "years_since_consent": 2.6
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001429",
  "E14001116",
  "E14001171",
  "E14001388",
  "E14001485"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}