CONSTITUENCY BRIEFING · ENERGYMAP.APP

Fermanagh and South Tyrone

MP: Pat Cullen (Sinn Féin) Northern Ireland Data to July 2026

Fermanagh and South Tyrone has 20 MW of clean power (all onshore wind) approved and still not built: enough to supply a year's electricity to 18,000 homes. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. Northern Ireland is on the all-Ireland grid, so Britain's grid bottlenecks do not reach bills here in the same way. There is also 221 MW of wind running here on the local network. If that gets switched off, no national record shows it.

Ranks 197 of 650 for clean power approved and not built.

What is stuck, and why

Project and developerTechSizeWhy it is stuck
Derrymeen Battery Energy Storage SystemSSE Renewables Battery 100 MW Under constructionWho can move it: the developer · earliest connection 2027 (in construction) · planning ref LA09/2024/0461/F
Battery Energy Storage System Development in TyroneHeron Storage Limited Battery 50 MW Approved a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref LA10/2024/0294/F
Omagh Road, Garvaghy - Battery Energy StorageHeron Storage Limited Battery 50 MW Approved less than a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref ZG2024/1152/PAS
Battery Energy Storage System in NewmillsExergy Solutions Limited Battery 24 MW Approved a year ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref LA09/2024/0451/F
Shantavy ScotchBrookfield Renewable Onshore wind 14 MW12,000 homes Approved 5 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref LA09/2020/0880/F

Plus 1 smaller projects — see the full seat page.

Compared with its neighbours

ConstituencyApproved, not builtRunningPaid to switch off
Fermanagh and South Tyrone 20 MW221 MWnot visible
Newry and Armagh 2.6 MW0 MWnot visible
Upper Bann 1.4 MW9.8 MWnot visible
Mid Ulster 48 MW34 MWnot visible
West Tyrone 84 MW493 MWnot visible

West Tyrone next door has 84 MW waiting, more than Fermanagh and South Tyrone's 20 MW.

The rest of the briefing

  • Every approval each project still needs, and which of them the public can see
  • What building them would mean here — community payments, business rates and construction work
  • Drafted parliamentary questions and letters, filled in with this seat's figures
  • 3 story angles for local reporting
  • A two-page PDF, and a newsroom edition with the references and who to call
FREE ACCOUNT · NO PASSWORD

Sets which edition you land on. We do not check it, and you can switch on any page.

Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.