Easington
Easington has 102 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 37,000 homes. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. That cost is shared across every bill in Britain, so households here pay for it too: about £116 a year per household, £4.9m across the constituency's 42,384 homes. There is also 28 MW of wind running here on the local network. If that gets switched off, no national record shows it. A 200 MW battery was refused planning here in 2026; while discharging it could have supplied about 701,000 homes.
here
The waiting list
Every approved, unbuilt project
| Site | Technology | Enough for | Capacity | Approved | Waiting |
|---|---|---|---|---|---|
| Sheraton Hall Solar FarmSheraton Hall Farm | Solar Photovoltaics | 18,000 homes | 49.9 MW | 2023-12 | 2.9 yrs |
| Hawthorn Pit -Solar FarmCroup Hill South Of Beaconsyde Farm Broadoaks Murton | Solar Photovoltaics | 18,000 homes | 49.9 MW | 2023-05 | 3.5 yrs |
| B H K UK Davy Drive - Solar PanelsB H K (UK) Davy Drive North West Industrial Estate Peterlee | Solar Photovoltaics | 500 homes | 1.3 MW | 2022-07 | 4.4 yrs |
| East Durham College, Willerby Grove - Solar panelsEast Durham College, Willerby Grove, Peterlee | Solar Photovoltaics | 200 homes | 0.5 MW | 2023-06 | 3.4 yrs |
| Lighthouse View Road - Solar Panels1a Lighthouse View Road, Spectrum Business Park, Seaham | Solar Photovoltaics | 100 homes | 0.3 MW | 2024-02 | 2.8 yrs |
| Morrisons, Murton - Solar Photovoltaic ArrayMorrisons 116 Dalton Park Murton, Seaham | Solar Photovoltaics | 100 homes | 0.2 MW | 2022-01 | 4.8 yrs |
| Peterlee Leisure Centre - Solar PanelsPeterlee Leisure Centre St Cuthberts Way, Peterlee | Solar Photovoltaics | 100 homes | 0.1 MW | 2022-02 | 4.8 yrs |
Plus 2 more approved within the last two years.
Batteries
| Site | Size | Status | While discharging |
|---|---|---|---|
| Hawthorn Pit Green Energy Park - Battery Energy Storage System | 1,000 MW | in planning | could supply ≈3,504,000 homes |
| Hallfield Farm, Easington - Battery Storage | 300 MW | in planning | could supply ≈1,051,000 homes |
| Carrs Farm, South Hetton - Battery Energy Storage System | 200 MW | refused 2026 | could supply ≈701,000 homes |
| Woodlands, Windermere Road - Battery Energy Storage | 90 MW | in planning | could supply ≈315,000 homes |
| Hallfield Farm, Easington - Battery Storage | 57 MW | in planning | could supply ≈200,000 homes |
| Hawthorn Grid Site - Battery Storage | 49 MW | 2022 | could supply ≈172,000 homes |
| Salters Lane - Solar Panels | 18 MW | in planning | could supply ≈63,000 homes |
| Benridge Farm, Fillpoke Lane - Battery Energy Storage System | 12 MW | in planning | could supply ≈42,000 homes |
| Harehill Farm, Haswell Plough - Solar Farm & Battery Energy Storage | 10 MW | refused 2025 | could supply ≈36,000 homes |
| Hackworth Road, North West Industrial Estate - Solar Panels | 10 MW | in planning | could supply ≈35,000 homes |
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →
What has Grahame Morris said about the grid in Parliament? Search Hansard →