No.67 of 650 · approved, not built MP: Grahame Morris (Labour) England

Easington

Easington has 102 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 37,000 homes. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. That cost is shared across every bill in Britain, so households here pay for it too: about £92 a year per household, £3.9m across the constituency's 42,384 homes. There is also 28 MW of wind running here on the local network. If that gets switched off, no national record shows it.

Not visible
here
28 MW of wind is running in this constituency, but it sits on the local network rather than the national grid — so if it is paid to switch off, no national record shows it. That is why this seat has no figure here: not because nothing happens, but because nobody publishes it. The £ figure for this seat is a floor, not a zero.
102 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 37,000 homes. Approved at least two years ago; waiting on the grid, not on planning. That is 3.1× the renewable capacity actually running here.
7 projects · planning database (REPD), July 2026 · how we worked this out
£3.9m
is what the grid gap costs this constituency's 42,384 households in a year between them — £92 each, about 51 days of one home's electricity.
The £92 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

6 of 7 waiting projects · years since approval
Morrisons, Murton - Solar Photovoltaic Array 0.2 MW
4.6 YRS
Peterlee Leisure Centre - Solar Panels 0.1 MW
4.5 YRS
B H K UK Davy Drive - Solar Panels 1.3 MW
4.1 YRS
Hawthorn Pit -Solar Farm 50 MW
3.2 YRS
East Durham College, Willerby Grove - Solar panels 0.5 MW
3.1 YRS
Sheraton Hall Solar Farm 50 MW
2.7 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Sheraton Hall Solar FarmSolar Photovoltaics18,000 homes49.9 MW2023-122.7 yrs
Hawthorn Pit -Solar FarmSolar Photovoltaics18,000 homes49.9 MW2023-053.2 yrs
B H K UK Davy Drive - Solar PanelsSolar Photovoltaics500 homes1.3 MW2022-074.1 yrs
East Durham College, Willerby Grove - Solar panelsSolar Photovoltaics200 homes0.5 MW2023-063.1 yrs
Lighthouse View Road - Solar PanelsSolar Photovoltaics100 homes0.3 MW2024-022.5 yrs
Morrisons, Murton - Solar Photovoltaic ArraySolar Photovoltaics100 homes0.2 MW2022-014.6 yrs
Peterlee Leisure Centre - Solar PanelsSolar Photovoltaics100 homes0.1 MW2022-024.5 yrs

Plus 2 more approved within the last two years.

Batteries

projects of 10 MW and above · planning database, July 2026 · what batteries do →
SiteSizeStatusWhile discharging
Hawthorn Pit Green Energy Park - Battery Energy Storage System1,000 MWcould supply ≈3,504,000 homes
Carrs Farm, South Hetton - Battery Energy Storage System200 MWcould supply ≈701,000 homes
Woodlands, Windermere Road - Battery Energy Storage90 MWcould supply ≈315,000 homes
Hallfield Farm, Easington - Battery Storage57 MWcould supply ≈200,000 homes
Hawthorn Grid Site - Battery Storage49 MWoperating 2022could supply ≈172,000 homes
Salters Lane - Solar Panels18 MWcould supply ≈63,000 homes
Benridge Farm, Fillpoke Lane - Battery Energy Storage System12 MWcould supply ≈42,000 homes
Harehill Farm, Haswell Plough - Solar Farm & Battery Energy Storage10 MWrefused 2025could supply ≈36,000 homes
Hackworth Road, North West Industrial Estate - Solar Panels10 MWcould supply ≈35,000 homes

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →

What has Grahame Morris said about the grid in Parliament? Search Hansard →

See the full league table Data (JSON)