 "pcon24cd": "E14001211",
 "name": "Easington",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 28.1,
   "sites": 6
  }
 },
 "number2": {
  "stuck_mw": 102.3,
  "stuck_mw_int": 102,
  "stuck_sites": 7,
  "homes_equivalent": 37000,
  "homes_vs_seat_households": 0.88,
  "stuck_mw_12m_cut": 110.3,
  "consented_not_built_mw_any_age": 110.5,
  "operational_mw": 33.1,
  "operational_homes_equivalent": 26000,
  "refused_5y_mw": 31.5,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 2.5,
  "rank": 67,
  "tech_mix": {
   "solar": 102.3
  },
  "tech_summary": "all solar",
  "waiting_vs_running": 3.1,
  "projects": [
   {
    "site_name": "Sheraton Hall Solar Farm",
    "repd_ref_id": 8254,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 49.9,
    "homes_equivalent": 18000,
    "consented": "2023-12-06",
    "months_waiting": 31.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Hawthorn Pit -Solar Farm",
    "repd_ref_id": 9799,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 49.9,
    "homes_equivalent": 18000,
    "consented": "2023-05-25",
    "months_waiting": 38.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Fox Cover Solar Farm - Ground Mounted Photovoltaic Panels",
    "repd_ref_id": 16237,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 8.0,
    "homes_equivalent": 2900,
    "consented": "2025-03-12",
    "months_waiting": 16.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "B H K UK Davy Drive - Solar Panels",
    "repd_ref_id": 10988,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 1.3,
    "homes_equivalent": 500,
    "consented": "2022-07-04",
    "months_waiting": 49.0,
    "status": "Under Construction"
   },
   {
    "site_name": "East Durham College, Willerby Grove - Solar panels",
    "repd_ref_id": 13743,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.5,
    "homes_equivalent": 200,
    "consented": "2023-06-08",
    "months_waiting": 37.8,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Lighthouse View Road - Solar Panels",
    "repd_ref_id": 15459,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2024-02-01",
    "months_waiting": 30.0,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Morrisons, Murton - Solar Photovoltaic Array",
    "repd_ref_id": 10372,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2022-01-11",
    "months_waiting": 54.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Howletch Lane Primary School -Solar Panels",
    "repd_ref_id": 19862,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2025-12-09",
    "months_waiting": 7.8,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Peterlee Leisure Centre - Solar Panels",
    "repd_ref_id": 10391,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.1,
    "homes_equivalent": 100,
    "consented": "2022-02-02",
    "months_waiting": 54.0,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 42384,
  "seat_total_gbp": 3900000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 49.0,
  "building_mw": 0.0,
  "approved_mw": 0.0,
  "approved_24m_mw": 0.0,
  "refused_mw": 10.4,
  "submitted_mw": 1387.0,
  "sites": [
   {
    "site_name": "Hawthorn Pit Green Energy Park - Battery Energy Storage System",
    "capacity_mw": 1000.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 3504000
   },
   {
    "site_name": "Carrs Farm, South Hetton - Battery Energy Storage System",
    "capacity_mw": 200.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 701000
   },
   {
    "site_name": "Woodlands, Windermere Road - Battery Energy Storage",
    "capacity_mw": 90.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 315000
   },
   {
    "site_name": "Hallfield Farm, Easington - Battery Storage",
    "capacity_mw": 57.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 200000
   },
   {
    "site_name": "Hawthorn Grid Site - Battery Storage",
    "capacity_mw": 49.0,
    "status": "operating",
    "year": 2022,
    "homes_while_discharging": 172000
   },
   {
    "site_name": "Salters Lane - Solar Panels",
    "capacity_mw": 18.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 63000
   },
   {
    "site_name": "Benridge Farm, Fillpoke Lane - Battery Energy Storage System",
    "capacity_mw": 12.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 42000
   },
   {
    "site_name": "Harehill Farm, Haswell Plough - Solar Farm & Battery Energy Storage",
    "capacity_mw": 10.3,
    "status": "refused",
    "year": 2025,
    "homes_while_discharging": 36000
   },
   {
    "site_name": "Hackworth Road, North West Industrial Estate - Solar Panels",
    "capacity_mw": 10.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 35000
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Hawthorn Pit Green Energy Park - Battery Energy Storage System",
   "repd_ref_id": 19676,
   "technology": "Battery",
   "capacity_mw": 1000.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "County Durham",
   "planning_ref": "DM/25/02255/FPA",
   "operator": "NatPower UK",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2035",
    "who": "the grid operator (NESO) and National Grid",
    "evidence": {
     "project": "NatPower Hawthorn Pit Green Energy Park",
     "connection_date": "2035-10-30",
     "mw": 1000.0,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "in_planning"
    ]
   },
   "earliest": "2035",
   "tec": {
    "project": "NatPower Hawthorn Pit Green Energy Park",
    "connection_date": "2035-10-30",
    "connection_year": 2035,
    "mw": 1000.0,
    "stage": null,
    "who": "the grid operator (NESO) and National Grid",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Carrs Farm, South Hetton - Battery Energy Storage System",
   "repd_ref_id": 18249,
   "technology": "Battery",
   "capacity_mw": 200.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "County Durham",
   "planning_ref": "DM/25/01345/FPA",
   "operator": "Stephenson Halliday",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 14 months for a planning decision",
    "who": "County Durham Council",
    "evidence": {
     "submitted": "2025-05-21",
     "months_waiting": 14
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Woodlands, Windermere Road - Battery Energy Storage",
   "repd_ref_id": 17574,
   "technology": "Battery",
   "capacity_mw": 90.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "County Durham",
   "planning_ref": "DM/25/01835/FPA",
   "operator": "Build Studios",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 13 months for a planning decision",
    "who": "County Durham Council",
    "evidence": {
     "submitted": "2025-07-08",
     "months_waiting": 13
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Hallfield Farm, Easington - Battery Storage",
   "repd_ref_id": 18988,
   "technology": "Battery",
   "capacity_mw": 57.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "County Durham",
   "planning_ref": "DM/25/01881/FPA",
   "operator": "Eden Renewables",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 13 months for a planning decision",
    "who": "County Durham Council",
    "evidence": {
     "submitted": "2025-07-12",
     "months_waiting": 13
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Hallfield Farm, Easington - Solar Farm",
   "repd_ref_id": 18987,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.9,
   "homes_equivalent": 18000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "County Durham",
   "planning_ref": "DM/25/01881/FPA",
   "operator": "Eden Renewables",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 13 months for a planning decision",
    "who": "County Durham Council",
    "evidence": {
     "submitted": "2025-07-12",
     "months_waiting": 13
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Hawthorn Pit -Solar Farm",
   "repd_ref_id": 9799,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.9,
   "homes_equivalent": 18000,
   "status": "Awaiting Construction",
   "consented": "2023-05-25",
   "refused": "2022-07-19",
   "planning_authority": "County Durham",
   "planning_ref": "DM/21/03420/FPA",
   "operator": "Aura Power Developments Limited",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2035, 12 years after it was approved",
    "who": "the grid operator (NESO) and National Grid",
    "evidence": {
     "project": "Noventum Hawthorn Pit",
     "connection_date": "2035-10-30",
     "mw": 57.0,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2035",
   "tec": {
    "project": "Noventum Hawthorn Pit",
    "connection_date": "2035-10-30",
    "connection_year": 2035,
    "mw": 57.0,
    "stage": null,
    "who": "the grid operator (NESO) and National Grid",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Sheraton Hall Solar Farm",
   "repd_ref_id": 8254,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.9,
   "homes_equivalent": 18000,
   "status": "Awaiting Construction",
   "consented": "2023-12-06",
   "refused": "2021-12-10",
   "planning_authority": "County Durham",
   "planning_ref": "DM/20/03722/FPA",
   "operator": "Lightsource BP",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-12-06",
     "years_since_consent": 2.7
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Seaham Solar Park, Stockton Road - Solar Farm",
   "repd_ref_id": 17386,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 48.0,
   "homes_equivalent": 17000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "County Durham",
   "planning_ref": "DM/25/00287/FPA",
   "operator": "Elements Green",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 17 months for a planning decision",
    "who": "County Durham Council",
    "evidence": {
     "submitted": "2025-02-25",
     "months_waiting": 17
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Benridge Farm, Fillpoke Lane - Solar Panels",
   "repd_ref_id": 18247,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 48.0,
   "homes_equivalent": 17000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "County Durham",
   "planning_ref": "DM/25/01964/FPA",
   "operator": "Development at Benridge Farm",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 13 months for a planning decision",
    "who": "County Durham Council",
    "evidence": {
     "submitted": "2025-07-18",
     "months_waiting": 13
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Harehill Farm, Haswell Plough - Solar Farm & Battery Energy Storage",
   "repd_ref_id": 16830,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 31.5,
   "homes_equivalent": 11000,
   "status": "Application Refused",
   "consented": null,
   "refused": "2025-07-04",
   "planning_authority": "County Durham",
   "planning_ref": "DM/24/03473/FPA",
   "operator": "Hare Hill  Solar Limited",
   "reason": {
    "reason": "refused",
    "label": "Refused by County Durham Council in 2025",
    "who": "County Durham Council",
    "evidence": {
     "refusal_date": "2025-07-04"
    },
    "all_matches": [
     "refused"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Salters Lane - Solar Panels",
   "repd_ref_id": 18564,
   "technology": "Battery",
   "capacity_mw": 18.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "Durham",
   "planning_ref": "DM/25/01801/FPA",
   "operator": "Grupotec Solar Uk 9 Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 13 months for a planning decision",
    "who": "Durham Council",
    "evidence": {
     "submitted": "2025-07-11",
     "months_waiting": 13
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Hackworth Road, North West Industrial Estate - Solar Panels",
   "repd_ref_id": 18298,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 15.4,
   "homes_equivalent": 5600,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "County Durham",
   "planning_ref": "DM/25/02042/FPA",
   "operator": "ABEI Energy Green IX Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 12 months for a planning decision",
    "who": "County Durham Council",
    "evidence": {
     "submitted": "2025-07-31",
     "months_waiting": 12
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Benridge Farm, Fillpoke Lane - Battery Energy Storage System",
   "repd_ref_id": 18248,
   "technology": "Battery",
   "capacity_mw": 12.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "County Durham",
   "planning_ref": "DM/25/01964/FPA",
   "operator": "Development at Benridge Farm",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 13 months for a planning decision",
    "who": "County Durham Council",
    "evidence": {
     "submitted": "2025-07-18",
     "months_waiting": 13
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Harehill Farm, Haswell Plough - Solar Farm & Battery Energy Storage",
   "repd_ref_id": 16831,
   "technology": "Battery",
   "capacity_mw": 10.3,
   "homes_equivalent": null,
   "status": "Application Refused",
   "consented": null,
   "refused": "2025-07-04",
   "planning_authority": "County Durham",
   "planning_ref": "DM/24/03473/FPA",
   "operator": "Hare Hill  Solar Limited",
   "reason": {
    "reason": "refused",
    "label": "Refused by County Durham Council in 2025",
    "who": "County Durham Council",
    "evidence": {
     "refusal_date": "2025-07-04"
    },
    "all_matches": [
     "refused"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Hackworth Road, North West Industrial Estate - Solar Panels",
   "repd_ref_id": 19425,
   "technology": "Battery",
   "capacity_mw": 10.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "County Durham",
   "planning_ref": "DM/25/02042/FPA",
   "operator": "ABEI Energy Green IX Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 12 months for a planning decision",
    "who": "County Durham Council",
    "evidence": {
     "submitted": "2025-07-31",
     "months_waiting": 12
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Fox Cover Solar Farm - Ground Mounted Photovoltaic Panels",
   "repd_ref_id": 16237,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 8.0,
   "homes_equivalent": 2900,
   "status": "Awaiting Construction",
   "consented": "2025-03-12",
   "refused": null,
   "planning_authority": "County Durham",
   "planning_ref": "DM/24/00783/FPA",
   "operator": "Enviromena Project Management UK Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-03-12",
     "years_since_consent": 1.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "B H K UK Davy Drive - Solar Panels",
   "repd_ref_id": 10988,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 1.3,
   "homes_equivalent": 500,
   "status": "Under Construction",
   "consented": "2022-07-04",
   "refused": null,
   "planning_authority": "County Durham",
   "planning_ref": "DM/22/00800/FPA",
   "operator": "BHK (UK) Limited",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001382",
  "E14001173",
  "E14001272",
  "E14001295",
  "E14001531"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}