CONSTITUENCY BRIEFING · ENERGYMAP.APP
Coventry South
Coventry South has no significant clean power approved and waiting to be built, and none running. Britain's grid bottlenecks still add to bills here: about £116 a year per household, £5.0m across the constituency's 43,462 homes.
Ranks 454 of 650 for clean power approved and not built.
What is stuck, and why
| Project and developer | Tech | Size | Why it is stuck |
|---|---|---|---|
| Torrington Avenue Battery Storage FacilityPower Initiatives Limited | Battery | 30 MW | Approved 2 years ago — nothing has happened sinceWho can move it: the developer and the network company · planning ref PL/2024/0000114/FULM |
| University Campus, Heronbank North - Phase 2 - Solar PanelsIvegate | Solar | 1.1 MW400 homes | Applied in 2026, still waiting for a decisionWho can move it: Coventry Council · planning ref W/26/0561 |
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Coventry South | 0.8 MW | 0 MW | not visible |
| Kenilworth and Southam | 235 MW | 124 MW | not visible |
| Coventry East | 1.5 MW | 0 MW | not visible |
| Meriden and Solihull East | 1.9 MW | 0 MW | not visible |
| Coventry North West | 0.2 MW | 0 MW | not visible |
| Rugby | 77 MW | 25 MW | not visible |
Kenilworth and Southam next door has 235 MW waiting, more than Coventry South's 0.8 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- What building them would mean here — community payments, business rates and construction work
- Drafted parliamentary questions and letters, filled in with this seat's figures
- 2 story angles for local reporting
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.