CONSTITUENCY BRIEFING · ENERGYMAP.APP
Belfast East
Belfast East has no large renewable or battery projects in the planning database. Northern Ireland is on the all-Ireland grid, so Britain's grid bottlenecks do not reach bills here in the same way.
Ranks 569 of 650 for clean power approved and not built.
What is stuck, and why
| Project and developer | Tech | Size | Why it is stuck |
|---|---|---|---|
| Belfast Harbour EstateBombardier | EfW Incineration | 15 MW | Under constructionWho can move it: the developer · earliest connection 2027 (in construction) · planning ref Z/2012/1387/F |
Compared with its neighbours
| Constituency | Approved, not built | Running | Paid to switch off |
|---|---|---|---|
| Belfast East | 0 MW | 0 MW | not visible |
| Strangford | 0.3 MW | 6 MW | not visible |
| Belfast South and Mid Down | 0.2 MW | 0 MW | not visible |
| North Down | 0 MW | 0 MW | not visible |
| Belfast North | 0.2 MW | 3.8 MW | not visible |
Strangford next door has 0.3 MW waiting, more than Belfast East's 0 MW.
The rest of the briefing
- Every approval each project still needs, and which of them the public can see
- Drafted parliamentary questions and letters, filled in with this seat's figures
- A two-page PDF, and a newsroom edition with the references and who to call
Everything above needs no account, and neither does the full seat page, the method or this constituency's raw data. The account covers the packaged briefing and its PDF, and nothing else.