No.150 of 650 · approved, not built MP: Kirsteen Sullivan (Labour (Co-op)) Scotland

Bathgate and Linlithgow

Bathgate and Linlithgow has 46 MW of clean power (mostly solar) approved and still not built: enough to supply a year's electricity to 24,000 homes. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. That cost is shared across every bill in Britain, so households here pay for it too: about £92 a year per household, £3.9m across the constituency's 42,817 homes.

Not visible
here
8.5 MW of wind is running in this constituency, but it sits on the local network rather than the national grid — so if it is paid to switch off, no national record shows it. That is why this seat has no figure here: not because nothing happens, but because nobody publishes it. The £ figure for this seat is a floor, not a zero.
46 MW
of clean power — mostly solar — approved and still not built, enough to supply a year's electricity to 24,000 homes. Approved at least two years ago; waiting on the grid, not on planning. That is 4.7× the renewable capacity actually running here.
6 projects · 31 MW solar, 15 MW onshore wind · planning database (REPD), July 2026 · how we worked this out
£3.9m
is what the grid gap costs this constituency's 42,817 households in a year between them — £92 each, about 51 days of one home's electricity.
The £92 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

6 of 6 waiting projects · years since approval
Blackburn Waste Water Treatrment, Redhouse Road - Solar Panels 0.3 MW
3.8 YRS
Bathgate Waste Water Treatment - Solar Panels 0.3 MW
3.8 YRS
Heartland Terrace, Heartlands - Solar Photovoltaic Panels 0.5 MW
3.6 YRS
The Vu, Roscam House - Solar Photovoltaics Array
2.7 YRS
Duddingston Solar Farm and Battery Storage 30 MW
2.3 YRS
Drumduff Wind Farm Extension 15 MW
2.3 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Duddingston Solar Farm and Battery StorageSolar Photovoltaics11,000 homes29.9 MW2024-042.3 yrs
Drumduff Wind Farm ExtensionWind Onshore13,000 homes15.0 MW2024-042.3 yrs
Heartland Terrace, Heartlands - Solar Photovoltaic PanelsSolar Photovoltaics200 homes0.5 MW2022-123.6 yrs
Blackburn Waste Water Treatrment, Redhouse Road - Solar PanelsSolar Photovoltaics100 homes0.3 MW2022-093.8 yrs
Bathgate Waste Water Treatment - Solar PanelsSolar Photovoltaics100 homes0.3 MW2022-103.8 yrs
The Vu, Roscam House - Solar Photovoltaics ArraySolar Photovoltaics— MW2023-122.7 yrs

Plus 2 more approved within the last two years.

Batteries

projects of 10 MW and above · planning database, July 2026 · what batteries do →
SiteSizeStatusWhile discharging
Pond Industrial Park, Whitburn Road - Pond Battery Storage200 MWapproved, not built 2025could supply ≈701,000 homes
Middlerigg - Battery Energy Storage50 MWapproved, not built 2025could supply ≈175,000 homes
Duddingston Solar Farm and Battery Storage20 MWapproved, not built 2024could supply ≈70,000 homes

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →