No.97 of 650 · approved, not built MP: Mr Luke Charters (Labour) England

York Outer

York Outer has 74 MW of clean power (almost all solar) approved and still not built: enough to supply a year's electricity to 27,000 homes. Britain's grid bottlenecks still add to bills here: about £116 a year per household, £4.6m across the constituency's 40,162 homes.

Not visible
here
No big wind farm on the national grid is mapped to this constituency, so no switch-off payments show here in national data. Smaller wind farms on the local grid can still be paid to switch off — invisibly. The £ figure for this seat is a floor, not a zero.
74 MW
of clean power — almost all solar — approved and still not built, enough to supply a year's electricity to 27,000 homes. Approved at least two years ago; waiting on the grid, not on planning.
8 projects · 74 MW solar, 0.5 MW hydro · planning database (REPD), July 2026 · how we worked this out
£4.6m
is what the grid gap costs this constituency's 40,162 households in a year between them — £116 each, about 65 days of one home's electricity.
The £116 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

6 of 8 waiting projects · years since approval
Naburn Weir Hydro 0.5 MW
6.8 YRS
Haggwood Farm, Broad Highway - Solar Panels 0.2 MW
3.5 YRS
Westhouse Farm, Elvington - Solar Array 0.2 MW
3.5 YRS
Walbutts Sewage Works, Brecks Lane - Solar Array 0.3 MW
3.1 YRS
Hessay Solar Farm 40 MW
2.7 YRS
Newlands Farm, Wigginton - Solar Panels 0.3 MW
2.5 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Hessay Solar FarmThe North And South Of Low Moor Lane Hessay YorkSolar Photovoltaics15,000 homes40.0 MW2024-032.7 yrs
Poppleton Solar FarmSouth Of New Farm Lords Lane Nether PoppletonSolar Photovoltaics12,000 homes32.6 MW2024-102.1 yrs
Naburn Weir HydroNaburn Locks, York Road, Naburn, York, North YorkshireSmall Hydro600 homes0.5 MW2020-016.8 yrs
Sainsburys supermarket, Monks Cross Drive - Solar PanelsSainsbury Plc, Monks Cross Drive, Huntington, YorkSolar Photovoltaics100 homes0.3 MW2024-102.1 yrs
Walbutts Sewage Works, Brecks Lane - Solar ArrayWalbutts Sewage Works Brecks Lane StrensallSolar Photovoltaics100 homes0.3 MW2023-093.1 yrs
Newlands Farm, Wigginton - Solar PanelsNewlands Farm WiggintonSolar Photovoltaics100 homes0.3 MW2024-052.5 yrs
Haggwood Farm, Broad Highway - Solar PanelsW/O Hagg Wood Broad Highway WheldrakeSolar Photovoltaics100 homes0.2 MW2023-043.5 yrs
Westhouse Farm, Elvington - Solar ArrayWesthouse Farm West House Farm Track ElvingtonSolar Photovoltaics100 homes0.2 MW2023-043.5 yrs

Plus 8 more approved within the last two years.

Batteries

projects of 10 MW and above · planning database, July 2026 · what batteries do →
SiteSizeStatusWhile discharging
East York Energy Hub250 MWapproved, not built 2025could supply ≈876,000 homes
Murton Way - Battery Energy Storage100 MWapproved, not built 2025could supply ≈350,000 homes
Monets Garden Battery, Osbaldwick - Energy Storage Facility50 MWapproved, not built 2025could supply ≈175,000 homes
Osbaldwick Substation50 MWoperating 2020could supply ≈175,000 homes
Meadowville, Hull Road - Battery Energy Storage System48 MWapproved, not built 2025could supply ≈168,000 homes
Sutton-on-the-Forest, Brownmoor Lane -BESS10 MWcould supply ≈35,000 homes

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →