Wythenshawe and Sale East
Wythenshawe and Sale East has 2.4 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 900 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.3m across the constituency's 46,836 homes.
here
The waiting list
Every approved, unbuilt project
| Site | Technology | Enough for | Capacity | Approved | Waiting |
|---|---|---|---|---|---|
| Sunbank Lane Solar Panels | Solar Photovoltaics | 500 homes | 1.5 MW | 2021-07 | 5.1 yrs |
| Timpson Road - Solar Panels | Solar Photovoltaics | 200 homes | 0.5 MW | 2022-05 | 4.2 yrs |
| Wythenshawe Hospital - Solar photovoltaic | Solar Photovoltaics | 200 homes | 0.5 MW | 2022-05 | 4.2 yrs |
Plus 7 more approved within the last two years.
Batteries
| Site | Size | Status | While discharging |
|---|---|---|---|
| Freshfields, Fairy Lane - Battery Storage | 100 MW | being built 2023 | could supply ≈350,000 homes |
| Golf Road - Battery Energy Storage | 90 MW | approved, not built 2024 | could supply ≈315,000 homes |
| Sale Golf Club, Golf Road - Battery Storage | 70 MW | approved, not built 2023 | could supply ≈245,000 homes |
| West Didsbury Battery Storage | 50 MW | 2019 | could supply ≈175,000 homes |
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →