No.234 of 650 · approved, not built MP: Sureena Brackenridge (Labour) England

Wolverhampton North East

Wolverhampton North East has 8.1 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 3,000 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.9m across the constituency's 42,285 homes.

Not visible
here
No big wind farm on the national grid is mapped to this constituency, so no switch-off payments show here in national data. Smaller wind farms on the local grid can still be paid to switch off — invisibly. The £ figure for this seat is a floor, not a zero.
8.1 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 3,000 homes. Approved at least two years ago; waiting on the grid, not on planning.
6 projects · planning database (REPD), July 2026 · how we worked this out
£3.9m
is what the grid gap costs this constituency's 42,285 households in a year between them — £92 each, about 51 days of one home's electricity.
The £92 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

6 of 6 waiting projects · years since approval
Bowmans Harbour Solar Farm 6.9 MW
4.3 YRS
Assa Abloy The Meadows, Cannock Road - Solar Panels
3.2 YRS
University Technical College, Cambridge Street - Solar Panels
3.0 YRS
Sherwood Stainless Steel, Mammoth Drive - Solar Panels 0.7 MW
2.9 YRS
Willenhall E Act School Academy, Furzebank Way - Solar Panels 0.2 MW
2.9 YRS
Arnold Clark, Bearing Drive - Solar panels 0.4 MW
2.3 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Bowmans Harbour Solar FarmSolar Photovoltaics2,500 homes6.9 MW2022-044.3 yrs
Sherwood Stainless Steel, Mammoth Drive - Solar PanelsSolar Photovoltaics300 homes0.7 MW2023-082.9 yrs
Arnold Clark, Bearing Drive - Solar panelsSolar Photovoltaics100 homes0.4 MW2024-042.3 yrs
Willenhall E Act School Academy, Furzebank Way - Solar PanelsSolar Photovoltaics100 homes0.2 MW2023-082.9 yrs
Assa Abloy The Meadows, Cannock Road - Solar PanelsSolar Photovoltaics— MW2023-053.2 yrs
University Technical College, Cambridge Street - Solar PanelsSolar Photovoltaics— MW2023-083.0 yrs

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →

What has Sureena Brackenridge said about the grid in Parliament? Search Hansard →

See the full league table Data (JSON)