Winchester
Winchester has 19 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 6,900 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.9m across the constituency's 42,375 homes.
here
The waiting list
Every approved, unbuilt project
| Site | Technology | Enough for | Capacity | Approved | Waiting |
|---|---|---|---|---|---|
| New Farm House Locks Farm | Solar Photovoltaics | 6,500 homes | 18.0 MW | 2023-06 | 3.1 yrs |
| Sainsburys Supermarkets, Badger Farm Road - Solar Panels | Solar Photovoltaics | 200 homes | 0.6 MW | 2024-06 | 2.1 yrs |
| Unit 2 To 5, Hazeley Enterprise Park - PV panels | Solar Photovoltaics | 100 homes | 0.2 MW | 2022-07 | 4.1 yrs |
| Whitewool Farm, East Meon - Solar Panels | Solar Photovoltaics | 100 homes | 0.2 MW | 2024-05 | 2.3 yrs |
| IBM Hursley - Solar Panels | Solar Photovoltaics | — | — MW | 2024-06 | 2.1 yrs |
Plus 3 more approved within the last two years.
Batteries
| Site | Size | Status | While discharging |
|---|---|---|---|
| Silkstead Farm, Poles Lane - Battery Energy Storage System | 50 MW | approved, not built 2025 | could supply ≈175,000 homes |
| Winchester Battery Storage | 19 MW | 2017 | could supply ≈67,000 homes |
| Stockbridge Road | 10 MW | approved, not built 2017 | could supply ≈35,000 homes |
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →
What has Dr Danny Chambers said about the grid in Parliament? Search Hansard →