No.113 of 650 · approved, not built MP: Sir Alec Shelbrooke (Conservative) England

Wetherby and Easingwold

Wetherby and Easingwold has 60 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 22,000 homes. Britain's grid bottlenecks still add to bills here: about £116 a year per household, £4.5m across the constituency's 38,999 homes.

Not visible
here
No big wind farm on the national grid is mapped to this constituency, so no switch-off payments show here in national data. Smaller wind farms on the local grid can still be paid to switch off — invisibly. The £ figure for this seat is a floor, not a zero.
60 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 22,000 homes. Approved at least two years ago; waiting on the grid, not on planning. That is 1.5× the renewable capacity actually running here.
11 projects · planning database (REPD), July 2026 · how we worked this out
£4.5m
is what the grid gap costs this constituency's 38,999 households in a year between them — £116 each, about 65 days of one home's electricity.
The £116 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

6 of 11 waiting projects · years since approval
Limebar Lane - Energy Distribution Centre
4.2 YRS
Harrogate Road - Solar Panels 0.2 MW
4.2 YRS
J Revis & Sons, South Field Lane - Solar PV System 0.5 MW
3.7 YRS
Rabbit Hill Park, Allerton Park - Solar Panels 0.3 MW
3.7 YRS
Wildon grange, Mill Field Lane - Solar Array 0.5 MW
3.6 YRS
Pond View Farm, Tholthorpe - Solar Array 0.2 MW
3.5 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Pilmoor Solar FarmOS Field 5220 BraffertonSolar Photovoltaics18,000 homes50.0 MW2024-092.2 yrs
Moto Wetherby Motorway Service Area, Deighton Gates Roundabout - Solar FarmMoto Wetherby Motorway Service Area, Deighton Gates Roundabout To County Boundary, Kirk Deighton, WetherbySolar Photovoltaics2,500 homes7.0 MW2024-082.3 yrs
Wildon grange, Mill Field Lane - Solar ArrayWildon Grange, Mill Field Lane, Coxwold, YorkSolar Photovoltaics200 homes0.5 MW2023-033.6 yrs
J Revis & Sons, South Field Lane - Solar PV SystemJ Revis And Sons, South Field Lane, Tockwith YorkSolar Photovoltaics200 homes0.5 MW2023-033.7 yrs
Harrogate South Waste Water Treatment Works - Ground Mounted Solar ArrayHarrogate South Waste Water Treatment Works, Sewage Works Track, Spofforth, KnaresboroughSolar Photovoltaics100 homes0.4 MW2023-063.4 yrs
Barneby Way, Boroughbridge - Solar PanelsS/O Barneby Way, Boroughbridge, YorkSolar Photovoltaics100 homes0.3 MW2024-082.3 yrs
Rabbit Hill Park, Allerton Park - Solar PanelsRabbit Hill Park Allerton ParkSolar Photovoltaics100 homes0.3 MW2023-033.7 yrs
Pond View Farm, Tholthorpe - Solar ArrayPond View Farm, Tholthorpe, YorkSolar Photovoltaics100 homes0.2 MW2023-053.5 yrs
Harrogate Road - Solar PanelsThe Adventure Site Stockeld Park Harrogate Road StockeldSolar Photovoltaics100 homes0.2 MW2022-094.2 yrs
Newby Hall Estate, The Stables - Solar PanelsNewby Hall Estate The StablesSolar Photovoltaics100 homes0.1 MW2023-063.4 yrs
Limebar Lane - Energy Distribution CentreOs Field 2161 Limebar Lane, Marton Cum, Grafton, YorkSolar Photovoltaics—— MW2022-084.2 yrs

Plus 7 more approved within the last two years.

Batteries

projects of 10 MW and above · planning database, July 2026 · what batteries do →
SiteSizeStatusWhile discharging
Hayton House, North Aberford - Solar Farm & Battery Storage50 MWapproved, not built 2026could supply ≈175,000 homes
Warren Lane, Bramham - Battery Energy Storage35 MWapproved, not built 2025could supply ≈123,000 homes
Wormald Green - Battery Energy Storage System33 MWoperating 2022could supply ≈116,000 homes
Boscar Grange Farm27 MWoperatingcould supply ≈95,000 homes

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →

What has Sir Alec Shelbrooke said about the grid in Parliament? Search Hansard →

See the full league table Data (JSON)