West Lancashire
West Lancashire has 1.5 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 600 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.8m across the constituency's 41,232 homes.
here
The waiting list
Every approved, unbuilt project
| Site | Technology | Enough for | Capacity | Approved | Waiting |
|---|---|---|---|---|---|
| Stopgate Lane, Simonswood - Solar Panels | Solar Photovoltaics | 300 homes | 0.7 MW | 2022-10 | 3.8 yrs |
| Suttons Farm, Lord Sefton Way - Solar Pv System | Solar Photovoltaics | 200 homes | 0.5 MW | 2024-06 | 2.2 yrs |
| Hannah Food Services, Garnett Place - Solar Photovoltaic Panels | Solar Photovoltaics | 100 homes | 0.4 MW | 2024-03 | 2.4 yrs |
| Deans Lane Wind Turbine | Wind Onshore | — | — MW | 2021-11 | 4.7 yrs |
Plus 5 more approved within the last two years.
Batteries
| Site | Size | Status | While discharging |
|---|---|---|---|
| Avondale Nurseries, Spa Lane - Battery Energy Storage | 320 MW | approved, not built 2025 | could supply ≈1,121,000 homes |
| Tontine Road - Battery Energy Storage System | 70 MW | in planning | could supply ≈245,000 homes |
| Far Moor - Battery Energy Storage System | 50 MW | in planning | could supply ≈175,000 homes |
| Unit 5 XL Business Park | 50 MW | being built 2017 | could supply ≈175,000 homes |
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →
What has Ashley Dalton said about the grid in Parliament? Search Hansard →