No.87 of 650 · approved, not built MP: Tessa Munt (Liberal Democrat) England

Wells and Mendip Hills

Wells and Mendip Hills has 78 MW of clean power (almost all solar) approved and still not built: enough to supply a year's electricity to 29,000 homes. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. That cost is shared across every bill in Britain, so households here pay for it too: about £92 a year per household, £3.5m across the constituency's 38,033 homes. A 50 MW battery was refused planning here in 2024; while discharging it could have supplied about 175,000 homes.

Not visible
here
No big wind farm on the national grid is mapped to this constituency, so no switch-off payments show here in national data. Smaller wind farms on the local grid can still be paid to switch off — invisibly. The £ figure for this seat is a floor, not a zero.
78 MW
of clean power — almost all solar — approved and still not built, enough to supply a year's electricity to 29,000 homes. Approved at least two years ago; waiting on the grid, not on planning. That is 0.6× the renewable capacity actually running here.
11 projects · 76 MW solar, 1 MW onshore wind · planning database (REPD), July 2026 · how we worked this out
£3.5m
is what the grid gap costs this constituency's 38,033 households in a year between them — £92 each, about 51 days of one home's electricity.
The £92 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

6 of 11 waiting projects · years since approval
Smart Systems 1 MW
10.8 YRS
Smart Systems 1 MW
10.8 YRS
Cadbury Garden And Leisure - Solar PV Panels 0.5 MW
4.7 YRS
Bowerhouse Farm (extension) 20 MW
4.4 YRS
Langford - Roof Mounted Solar Photovoltaic Panels 0.6 MW
4.3 YRS
Bellcombe Works, Brent Road - Solar Panels 0.6 MW
3.9 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Yanel Farm, Churchill Green - Solar FarmSolar Photovoltaics18,000 homes49.9 MW2024-042.3 yrs
Bowerhouse Farm (extension)Solar Photovoltaics7,200 homes19.8 MW2022-034.4 yrs
Smart Systems Limited, Arnolds Way - Solar PanelsSolar Photovoltaics1,100 homes2.9 MW2023-102.8 yrs
Smart SystemsWind Onshore900 homes1.0 MW2015-0910.8 yrs
Smart SystemsSolar Photovoltaics400 homes1.0 MW2015-0910.8 yrs
Arnolds Way, Yatton - Solar PanelsSolar Photovoltaics300 homes0.8 MW2022-103.8 yrs
Langford - Roof Mounted Solar Photovoltaic PanelsSolar Photovoltaics200 homes0.6 MW2022-044.3 yrs
Bellcombe Works, Brent Road - Solar PanelsSolar Photovoltaics200 homes0.6 MW2022-093.9 yrs
Cadbury Garden And Leisure - Solar PV PanelsSolar Photovoltaics200 homes0.5 MW2021-114.7 yrs
Showerings Cider Mill, Kilver Street - Solar PanelsSolar Photovoltaics100 homes0.3 MW2024-012.6 yrs
Cheddar Water Recycling Centre, Wedmore Road - Solar FarmSolar Photovoltaics— MW2023-112.7 yrs

Plus 9 more approved within the last two years.

Batteries

projects of 10 MW and above · planning database, July 2026 · what batteries do →
SiteSizeStatusWhile discharging
Station Road & Nye Road, Sandford - Battery Energy Storage System100 MWcould supply ≈350,000 homes
Yeowood Farm - Battery Energy Storage50 MWrefused 2024could supply ≈175,000 homes
Manor Farm, Wick Lane - Solar Farm & Battery Storage24 MWcould supply ≈84,000 homes

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →