No.83 of 650 · approved, not built MP: Cameron Thomas (Independent) England

Tewkesbury

Tewkesbury has 82 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 30,000 homes. Britain's grid bottlenecks still add to bills here: about £116 a year per household, £4.8m across the constituency's 41,561 homes.

Not visible
here
No big wind farm on the national grid is mapped to this constituency, so no switch-off payments show here in national data. Smaller wind farms on the local grid can still be paid to switch off — invisibly. The £ figure for this seat is a floor, not a zero.
82 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 30,000 homes. Approved at least two years ago; waiting on the grid, not on planning. That is 2.0× the renewable capacity actually running here.
6 projects · planning database (REPD), July 2026 · how we worked this out
£4.8m
is what the grid gap costs this constituency's 41,561 households in a year between them — £116 each, about 65 days of one home's electricity.
The £116 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

3 of 6 waiting projects · years since approval
Claydon Farm - Solar Farm & Battery Storage 50 MW
4.9 YRS
Cox's Brook Solar Farm - Solar Array 16 MW
2.6 YRS
Bengrove Farm, Base Lane - Solar Farm 15 MW
2.1 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Claydon Farm - Solar Farm & Battery StorageLand At Claydon Farm Claydon TewkesburySolar Photovoltaics18,000 homes49.9 MW2021-124.9 yrs
Cox's Brook Solar Farm - Solar ArrayW/O Twigworth And E/O Coxs Brook, Twigworth, GloucesterSolar Photovoltaics5,800 homes16.0 MW2024-042.6 yrs
Bengrove Farm, Base Lane - Solar FarmBengrove Farm Base Lane SandhurstSolar Photovoltaics5,400 homes15.0 MW2024-102.1 yrs
Oxstalls Tennis CentreOxstalls Tennis Centre Plock Court GloucesterSolar Photovoltaics100 homes0.3 MW2021-045.5 yrs
Gloucester Road - Solar Carport ArrayCouncil Offices Gloucester Road TewkesburySolar Photovoltaics100 homes0.2 MW2022-034.7 yrs
Big Yellow Self Storage, Princess Elizabeth Way - Solar PanelsBig Yellow Self Storage, Princess Elizabeth Way, CheltenhamSolar Photovoltaics100 homes0.2 MW2024-082.2 yrs

Plus 4 more approved within the last two years.

Batteries

projects of 10 MW and above · planning database, July 2026 · what batteries do →
SiteSizeStatusWhile discharging
Claydon Farm - Solar Farm & Battery Storage50 MWapproved, not built 2021could supply ≈175,000 homes
Bengrove Farm, Base Lane - Battery Storage50 MWcould supply ≈175,000 homes
Tredington House Farm, Tredington - Battery Energy Storage Facility40 MWapproved, not built 2024could supply ≈140,000 homes

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →

What has Cameron Thomas said about the grid in Parliament? Search Hansard →

See the full league table Data (JSON)