Suffolk Coastal
Suffolk Coastal has 52 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 19,000 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.9m across the constituency's 42,806 homes.
here
The waiting list
Every approved, unbuilt project
| Site | Technology | Enough for | Capacity | Approved | Waiting |
|---|---|---|---|---|---|
| Bucklesham Solar Farm | Solar Photovoltaics | 9,100 homes | 25.0 MW | 2023-11 | 2.7 yrs |
| Town Farm - Solar panels | Solar Photovoltaics | 7,600 homes | 21.0 MW | 2024-01 | 2.6 yrs |
| Felixstowe Mega Distibution Centre - Photovoltaic Arrays | Solar Photovoltaics | 900 homes | 2.5 MW | 2022-12 | 3.7 yrs |
| Rock Barracks Solar Farm | Solar Photovoltaics | 500 homes | 1.5 MW | 2020-12 | 5.6 yrs |
| HMP Hollesley - Solar Array | Solar Photovoltaics | 400 homes | 1.2 MW | 2022-02 | 4.5 yrs |
| Morrison Supermarket, Grange Farm Avenue - Solar Panels | Solar Photovoltaics | 200 homes | 0.4 MW | 2024-03 | 2.4 yrs |
| East Green Farm, Kelsale Cum Carlton - Solar Panels | Solar Photovoltaics | 100 homes | 0.2 MW | 2022-10 | 3.8 yrs |
| Earlsway Farm, Bramfield - Solar Pv System | Solar Photovoltaics | 100 homes | 0.2 MW | 2024-02 | 2.5 yrs |
| Dale Farm, Drydale Bottom - Ground Mount Solar Panels | Solar Photovoltaics | 100 homes | 0.2 MW | 2023-05 | 3.2 yrs |
| Staverton Irrigation Pump House,Wantisden Road - Solar Panels | Solar Photovoltaics | 100 homes | 0.2 MW | 2023-05 | 3.3 yrs |
Plus 8 more approved within the last two years.
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →