No.40 of 650 · approved, not built MP: Manuela Perteghella (Liberal Democrat) England

Stratford-on-Avon

Stratford-on-Avon has 134 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 49,000 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.9m across the constituency's 42,393 homes.

Not visible
here
No big wind farm on the national grid is mapped to this constituency, so no switch-off payments show here in national data. Smaller wind farms on the local grid can still be paid to switch off — invisibly. The £ figure for this seat is a floor, not a zero.
134 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 49,000 homes — about as many homes as this constituency has. Approved at least two years ago; waiting on the grid, not on planning. That is 3.4× the renewable capacity actually running here.
7 projects · planning database (REPD), July 2026 · how we worked this out
£3.9m
is what the grid gap costs this constituency's 42,393 households in a year between them — £92 each, about 51 days of one home's electricity.
The £92 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

4 of 7 waiting projects · years since approval
Crimscote Solar Farm and Storage Project 50 MW
3.7 YRS
Atherstone Hill Solar Farm 26 MW
3.3 YRS
Sherbourne - Solar Farm 25 MW
3.0 YRS
Drayton Manor Farm, Alcester Road - Solar Farm Phase 2 32 MW
2.7 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Crimscote Solar Farm and Storage ProjectSolar Photovoltaics18,000 homes50.0 MW2022-113.7 yrs
Drayton Manor Farm, Alcester Road - Solar Farm Phase 2Solar Photovoltaics12,000 homes32.0 MW2023-112.7 yrs
Atherstone Hill Solar FarmSolar Photovoltaics9,400 homes26.0 MW2023-043.3 yrs
Sherbourne - Solar FarmSolar Photovoltaics9,100 homes25.0 MW2023-083.0 yrs
Millennium Hatchery, Henley Road - Solar PanelsSolar Photovoltaics200 homes0.4 MW2022-103.8 yrs
National Farmers Union, Tiddington Road - Solar PVSolar Photovoltaics100 homes0.2 MW2023-122.6 yrs
Stratford Healthcare, Arden Street - Solar PanelsSolar Photovoltaics100 homes0.2 MW2024-032.4 yrs

Plus 3 more approved within the last two years.

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →