Stratford-on-Avon
Stratford-on-Avon has 134 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 49,000 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.9m across the constituency's 42,393 homes.
here
The waiting list
Every approved, unbuilt project
| Site | Technology | Enough for | Capacity | Approved | Waiting |
|---|---|---|---|---|---|
| Crimscote Solar Farm and Storage Project | Solar Photovoltaics | 18,000 homes | 50.0 MW | 2022-11 | 3.7 yrs |
| Drayton Manor Farm, Alcester Road - Solar Farm Phase 2 | Solar Photovoltaics | 12,000 homes | 32.0 MW | 2023-11 | 2.7 yrs |
| Atherstone Hill Solar Farm | Solar Photovoltaics | 9,400 homes | 26.0 MW | 2023-04 | 3.3 yrs |
| Sherbourne - Solar Farm | Solar Photovoltaics | 9,100 homes | 25.0 MW | 2023-08 | 3.0 yrs |
| Millennium Hatchery, Henley Road - Solar Panels | Solar Photovoltaics | 200 homes | 0.4 MW | 2022-10 | 3.8 yrs |
| National Farmers Union, Tiddington Road - Solar PV | Solar Photovoltaics | 100 homes | 0.2 MW | 2023-12 | 2.6 yrs |
| Stratford Healthcare, Arden Street - Solar Panels | Solar Photovoltaics | 100 homes | 0.2 MW | 2024-03 | 2.4 yrs |
Plus 3 more approved within the last two years.
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →