Stockport has 1.2 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 400 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.3m across the constituency's 46,442 homes.
here
The waiting list
Every approved, unbuilt project
| Site | Technology | Enough for | Capacity | Approved | Waiting |
|---|---|---|---|---|---|
| A G Parfett and Son, Didsbury Road - Solar Panels | Solar Photovoltaics | 100 homes | 0.3 MW | 2023-05 | 3.2 yrs |
| Heaton Norris - Solar PV Panel | Solar Photovoltaics | 100 homes | 0.2 MW | 2022-08 | 3.9 yrs |
| Mercedes Benz, Heaton Mersey - Solar Panels | Solar Photovoltaics | 100 homes | 0.2 MW | 2023-07 | 3.0 yrs |
| Hercules Office Park, Bird Hall Lane - Solar Arrays | Solar Photovoltaics | 100 homes | 0.2 MW | 2023-10 | 2.8 yrs |
| Life Leisure Grand Central, Grand Central Square - Solar Panels | Solar Photovoltaics | 100 homes | 0.2 MW | 2022-12 | 3.6 yrs |
| Decathlon, Georges Road - Solar Pv System | Solar Photovoltaics | 100 homes | 0.1 MW | 2024-04 | 2.3 yrs |
Plus 2 more approved within the last two years.
Batteries
| Site | Size | Status | While discharging |
|---|---|---|---|
| Welkin Mill, Welkin Road - Battery Storage | 50 MW | being built 2023 | could supply ≈175,000 homes |
| Welkin Road, Bredbury - Battery Storage System | 20 MW | 2021 | could supply ≈70,000 homes |
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →
What has Navendu Mishra said about the grid in Parliament? Search Hansard →