Staffordshire Moorlands
Staffordshire Moorlands has 13 MW of renewables running, enough for 4,900 homes over a year, and nothing large waiting in the planning queue. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.5m across the constituency's 37,742 homes. A 99 MW battery was refused planning here in 2025; while discharging it could have supplied about 347,000 homes.
here
The waiting list
Every approved, unbuilt project
| Site | Technology | Enough for | Capacity | Approved | Waiting |
|---|---|---|---|---|---|
| F Ball & Company Limited, Station Road - Solar panels | Solar Photovoltaics | 100 homes | 0.4 MW | 2023-12 | 2.6 yrs |
Plus 2 more approved within the last two years.
Batteries
| Site | Size | Status | While discharging |
|---|---|---|---|
| Cellarhead Substation, Rownall Road - Battery Energy Facility | 400 MW | approved, not built 2022 | could supply ≈1,402,000 homes |
| Cellarhead Substation, Rownall Road - Battery Storage Facility | 400 MW | in planning | could supply ≈1,402,000 homes |
| Leek Road, Werrington - Battery Energy Storage | 300 MW | in planning | could supply ≈1,051,000 homes |
| Newfields Farm, Rownall Road - Battery Energy Storage | 100 MW | approved, not built 2025 | could supply ≈350,000 homes |
| Adj New House Farm, Luzlow Lane - Battery Energy Storage | 99 MW | refused 2025 | could supply ≈347,000 homes |
| Armshead Farm, Armshead Road - Battery Energy Storage Facility | 50 MW | approved, not built 2024 | could supply ≈175,000 homes |
| Brown Edge - Battery Storage | 50 MW | approved, not built 2025 | could supply ≈174,000 homes |
| Draycott Cross Road - Battery Storage System | 40 MW | approved, not built 2024 | could supply ≈140,000 homes |
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →
What has Dame Karen Bradley said about the grid in Parliament? Search Hansard →