No.510 of 650 · approved, not built MP: Dame Karen Bradley (Conservative) England

Staffordshire Moorlands

Staffordshire Moorlands has 13 MW of renewables running, enough for 4,900 homes over a year, and nothing large waiting in the planning queue. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.5m across the constituency's 37,742 homes. A 99 MW battery was refused planning here in 2025; while discharging it could have supplied about 347,000 homes.

Not visible
here
No big wind farm on the national grid is mapped to this constituency, so no switch-off payments show here in national data. Smaller wind farms on the local grid can still be paid to switch off — invisibly. The £ figure for this seat is a floor, not a zero.
0.4 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 100 homes. Approved at least two years ago; waiting on the grid, not on planning.
1 project · planning database (REPD), July 2026 · how we worked this out
£3.5m
is what the grid gap costs this constituency's 37,742 households in a year between them — £92 each, about 51 days of one home's electricity.
The £92 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

1 of 1 waiting projects · years since approval
F Ball & Company Limited, Station Road - Solar panels 0.4 MW
2.6 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
F Ball & Company Limited, Station Road - Solar panelsSolar Photovoltaics100 homes0.4 MW2023-122.6 yrs

Plus 2 more approved within the last two years.

Batteries

projects of 10 MW and above · planning database, July 2026 · what batteries do →
SiteSizeStatusWhile discharging
Cellarhead Substation, Rownall Road - Battery Energy Facility400 MWapproved, not built 2022could supply ≈1,402,000 homes
Cellarhead Substation, Rownall Road - Battery Storage Facility400 MWcould supply ≈1,402,000 homes
Leek Road, Werrington - Battery Energy Storage300 MWcould supply ≈1,051,000 homes
Newfields Farm, Rownall Road - Battery Energy Storage100 MWapproved, not built 2025could supply ≈350,000 homes
Adj New House Farm, Luzlow Lane - Battery Energy Storage99 MWrefused 2025could supply ≈347,000 homes
Armshead Farm, Armshead Road - Battery Energy Storage Facility50 MWapproved, not built 2024could supply ≈175,000 homes
Brown Edge - Battery Storage50 MWapproved, not built 2025could supply ≈174,000 homes
Draycott Cross Road - Battery Storage System40 MWapproved, not built 2024could supply ≈140,000 homes

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →

What has Dame Karen Bradley said about the grid in Parliament? Search Hansard →

See the full league table Data (JSON)