St Neots and Mid Cambridgeshire
St Neots and Mid Cambridgeshire has 52 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 19,000 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.0m across the constituency's 43,529 homes.
here
The waiting list
Every approved, unbuilt project
| Site | Technology | Enough for | Capacity | Approved | Waiting |
|---|---|---|---|---|---|
| Stargoose Farm - Solar Farm | Solar Photovoltaics | 18,000 homes | 50.0 MW | 2022-04 | 4.3 yrs |
| CRM Surgical, 1 Evolution Business Park - Solar Panels | Solar Photovoltaics | 300 homes | 0.8 MW | 2022-04 | 4.3 yrs |
| Morrisons , Broad Street, Cambourne - Solar Panles | Solar Photovoltaics | 200 homes | 0.5 MW | 2022-03 | 4.3 yrs |
| Domino House, Trafalgar Way - Solar panels | Solar Photovoltaics | 100 homes | 0.3 MW | 2024-03 | 2.4 yrs |
| New Road, Impington - Solar panels | Solar Photovoltaics | 100 homes | 0.3 MW | 2024-05 | 2.2 yrs |
| Chester Road, Colmworth Business Park - Solar Panles | Solar Photovoltaics | 100 homes | 0.2 MW | 2023-04 | 3.3 yrs |
| 3-5 Stirling Way, Papworth Everard - Solar PV Panels | Solar Photovoltaics | 100 homes | 0.2 MW | 2023-04 | 3.3 yrs |
Plus 3 more approved within the last two years.
Batteries
| Site | Size | Status | While discharging |
|---|---|---|---|
| Stargoose Farm - Battery Storage | 312 MW | approved, not built 2022 | could supply ≈1,093,000 homes |
| Weald Farm, Cambridge Road - Solar Farm & Battery Storage | 50 MW | approved, not built 2025 | could supply ≈175,000 homes |
| Falcon Park, Wilsons Road - Solar Farm & Battery Energy Storage | 20 MW | in planning | could supply ≈70,000 homes |
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →
What has Ian Sollom said about the grid in Parliament? Search Hansard →