No.208 of 650 · approved, not built MP: Rebecca Smith (Conservative) England

South West Devon

South West Devon has 21 MW of clean power (almost all solar) approved and still not built: enough to supply a year's electricity to 7,900 homes. Britain's grid bottlenecks still add to bills here: about £116 a year per household, £4.8m across the constituency's 41,475 homes.

Not visible
here
No big wind farm on the national grid is mapped to this constituency, so no switch-off payments show here in national data. Smaller wind farms on the local grid can still be paid to switch off — invisibly. The £ figure for this seat is a floor, not a zero.
21 MW
of clean power — almost all solar — approved and still not built, enough to supply a year's electricity to 7,900 homes. Approved at least two years ago; waiting on the grid, not on planning. That is 0.4× the renewable capacity actually running here.
16 projects · 20 MW solar, 0.5 MW hydro · planning database (REPD), July 2026 · how we worked this out
£4.8m
is what the grid gap costs this constituency's 41,475 households in a year between them — £116 each, about 65 days of one home's electricity.
The £116 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

6 of 16 waiting projects · years since approval
Plymouth Road, Plympton - Solar photovoltaic panels 0.2 MW
5.3 YRS
Tamerton Road, Roborough - Solar Panels 1 MW
4.6 YRS
Morrisons supermarket - Roof mounted Solar Photovoltaics 0.7 MW
4.5 YRS
Chelson Meadow - Solar Farm 13 MW
4.4 YRS
Western Wood Way, Plympton - Solar Panels 0.2 MW
4.3 YRS
Endsleigh Garden Centre, Endsleigh - Solar PV Panels 0.3 MW
3.9 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Chelson Meadow - Solar FarmNorthern Part Of Chelson Meadow, PlymouthSolar Photovoltaics4,700 homes13.0 MW2022-064.4 yrs
Mayflower Water Treatment Works, Roborough Down - Solar ArrayRoborough Down PlymouthSolar Photovoltaics600 homes1.6 MW2024-022.7 yrs
Tamerton Road, Roborough - Solar PanelsPlessey Semi Conductors Ltd Tamerton Road RoboroughSolar Photovoltaics400 homes1.0 MW2022-044.6 yrs
Princess Yachts Limited, Coypool Road - Solar PanelsPrincess Yachts Limited 55 Coypool Road PlymouthSolar Photovoltaics300 homes0.8 MW2023-083.3 yrs
Princess Yachts Limited, Coypool Road - Solar PanelsPrincess Yachts Ltd Coypool RoadSolar Photovoltaics300 homes0.7 MW2023-083.3 yrs
Morrisons supermarket - Roof mounted Solar Photovoltaics15 Pomphlett Road, PlymouthSolar Photovoltaics200 homes0.7 MW2022-054.5 yrs
Princess Yachts Limited, Coypool Road - Solar PanelsPrincess Yachts Ltd 15 Coypool RoadSolar Photovoltaics200 homes0.6 MW2023-083.3 yrs
Headon Works, Cornwood - Hydro Energy Storage FacilityHeadon Works, Tolchmoor Gate To Quick Bridge, Cornwood, IvybridgeSmall Hydro600 homes0.5 MW2024-032.6 yrs
Endsleigh Garden Centre, Endsleigh - Solar PV PanelsEndsleigh Garden Centre Endsleigh IvybridgeSolar Photovoltaics100 homes0.3 MW2022-123.9 yrs
Princess Yachts Limited, Coypool Road - Solar PanelsPrincess Yachts Limited Coypool Road PlymouthSolar Photovoltaics100 homes0.3 MW2023-083.3 yrs
Aldermans Tooling, Bell Close - Solar PV PanelsAldermans Tooling Limited, Bell Close Newnham Industrial Estate, PlymouthSolar Photovoltaics100 homes0.3 MW2023-033.6 yrs
Sugar Mill Industrial Estate, Billacombe Road - Solar PanelsUnits 29 - 34, Sugar Mill Industrial Estate Billacombe RoadSolar Photovoltaics100 homes0.3 MW2024-102.1 yrs
Western Wood Way, Plympton - Solar Panels1 Western Wood Way Langage Science Park PlymptonSolar Photovoltaics100 homes0.2 MW2022-074.3 yrs
Bandvulc Remoulds, Gillard Way - Solar Photovoltaics SystemBandvulc Remoulds Limited, Gillard Way, Lee Mill Industrial Estate, IvybridgeSolar Photovoltaics100 homes0.2 MW2024-012.8 yrs
Plymouth Road, Plympton - Solar photovoltaic panelsLidl Foodstore, Plymouth Road, Plympton, PlymouthSolar Photovoltaics100 homes0.2 MW2021-075.3 yrs
Western Wood Way, Langage Business Park - Solar Panels1 Western Wood Way, Langage Business Park, PlymouthSolar Photovoltaics—0.1 MW2024-112.0 yrs

Plus 1 more approved within the last two years.

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →

What has Rebecca Smith said about the grid in Parliament? Search Hansard →

See the full league table Data (JSON)