South Northamptonshire has 104 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 38,000 homes. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. That cost is shared across every bill in Britain, so households here pay for it too: about £92 a year per household, £3.9m across the constituency's 42,076 homes. A 50 MW battery was refused planning here in 2025; while discharging it could have supplied about 175,000 homes.

Not visible
here
7.2 MW of wind is running in this constituency, but it sits on the local network rather than the national grid — so if it is paid to switch off, no national record shows it. That is why this seat has no figure here: not because nothing happens, but because nobody publishes it. The £ figure for this seat is a floor, not a zero.
104 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 38,000 homes. Approved at least two years ago; waiting on the grid, not on planning. That is 1.2× the renewable capacity actually running here.
10 projects · planning database (REPD), July 2026 · how we worked this out
£3.9m
is what the grid gap costs this constituency's 42,076 households in a year between them — £92 each, about 51 days of one home's electricity.
The £92 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

3 of 10 waiting projects · years since approval
Sparrow Lodge Farm 20 MW
5.4 YRS
Welsh Lane 30 MW
4.7 YRS
Halse Road - Solar Farm & Battery Storage 50 MW
2.7 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Halse Road - Solar Farm & Battery StorageSolar Photovoltaics18,000 homes49.9 MW2023-112.7 yrs
Welsh LaneSolar Photovoltaics11,000 homes30.0 MW2021-114.7 yrs
Sparrow Lodge FarmSolar Photovoltaics7,300 homes20.0 MW2021-035.4 yrs
Cherwell Valley Business Park - Solar ParkSolar Photovoltaics1,200 homes3.2 MW2022-054.2 yrs
Cheaney Drive, Grange Park Industrial Estate - Solar PV ModulesSolar Photovoltaics100 homes0.3 MW2024-022.4 yrs
Sainsburys Supermarkets, Wellington Road - Solar PV ArraySolar Photovoltaics100 homes0.2 MW2023-102.8 yrs
Whittlebury Park, High Street - Solar PanelsSolar Photovoltaics100 homes0.2 MW2022-083.9 yrs
Whittlebury Park Golf & Country Club, High Street - Solar PanelsSolar Photovoltaics100 homes0.2 MW2023-033.4 yrs
Station Farm - Solar PanelsSolar Photovoltaics100 homes0.1 MW2022-064.1 yrs
Horton Lodge Farm - Solar PanelsSolar Photovoltaics100 homes0.1 MW2022-103.8 yrs

Plus 3 more approved within the last two years.

Batteries

projects of 10 MW and above · planning database, July 2026 · what batteries do →
SiteSizeStatusWhile discharging
Vicarage Farm - Battery Energy Storage System50 MWrefused 2025could supply ≈175,000 homes
Grendon Lakes, Grendon - Battery Storage Facility50 MWapproved, not built 2025could supply ≈175,000 homes

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →

What has Sarah Bool said about the grid in Parliament? Search Hansard →

See the full league table Data (JSON)