South Derbyshire
South Derbyshire has 22 MW of renewables running, enough for 8,100 homes over a year, and nothing large waiting in the planning queue. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.7m across the constituency's 40,094 homes.
here
Batteries
| Site | Size | Status | While discharging |
|---|---|---|---|
| Fairfields Energy Storage System | 1,025 MW | approved, not built 2025 | could supply ≈3,592,000 homes |
| Drakelow - Battery Energy Storage System | 1,000 MW | in planning | could supply ≈3,504,000 homes |
| Stenson Lane - Battery Energy Storage System | 400 MW | approved, not built 2025 | could supply ≈1,402,000 homes |
| Barn Farm - Batter Energy Storage Facility | 200 MW | approved, not built 2025 | could supply ≈701,000 homes |
| Derby Road, Egginton - Battery Storage Facility | 100 MW | approved, not built 2025 | could supply ≈350,000 homes |
| Arleston Solar & Battery Energy Storage System | 100 MW | in planning | could supply ≈350,000 homes |
| Caldwell Road - Battery Storage | 90 MW | approved, not built 2024 | could supply ≈315,000 homes |
| Park Road, Overseal - Battery Storage Facility | 50 MW | approved, not built 2025 | could supply ≈175,000 homes |
| Breach Farm - Energy Barn | 40 MW | approved, not built 2017 | could supply ≈140,000 homes |
| Landown Farm, Bakeacre Lane - Battery Energy Storage System | 40 MW | approved, not built 2025 | could supply ≈140,000 homes |
| Oaklands Solar Farm Project - Solar Farm & Battery Storage | 38 MW | approved, not built 2025 | could supply ≈131,000 homes |
| Mount Road, Castle Gresley - Battery Storage Facility | 20 MW | approved, not built 2022 | could supply ≈70,000 homes |
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →