No.11 OF 650 · APPROVED, NOT BUILT MP: Alicia Kearns (Conservative) England

Rutland and Stamford

Rutland and Stamford has 379 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 138,000 homes. No wind farm here is paid to switch off. Almost every pound of that money goes to wind farms in Scotland, held back by the crowded wires at the border. The cost is shared across every bill in Britain, so households here pay too: about £92 a year per household, £3.7m across the constituency's 39,908 homes.

Not visible
here
No big wind farm on the national grid is mapped to this constituency, so no switch-off payments show here in national data. Smaller wind farms on the local grid can still be paid to switch off — invisibly. The £ figure for this seat is a floor, not a zero.
379 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 138,000 homes — 3 times every household in this constituency. Approved at least two years ago; waiting on the grid, not on planning. That is 16.4× the renewable capacity actually running here.
6 projects · planning database (REPD), July 2026 · how we worked this out
£3.7m
is what the grid gap costs this constituency's 39,908 households in a year between them — £92 each, about 51 days of one home's electricity.
The £92 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

6 of 6 waiting projects · years since approval
Ranksborough Farm 28 MW
4.5 YRS
Morrison - Roof mounted solar panels 1 MW
4.2 YRS
Openfield, Colsterworth - Solar PV System 0 MW
4.0 YRS
Cherryholt Road - Solar Panels 0 MW
3.9 YRS
Rutland Garden Centre, Ashwell Road - Solar 0 MW
3.3 YRS
Mallard Pass Solar Farm 350 MW
2.1 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Mallard Pass Solar FarmSolar Photovoltaics127,000 homes350.0 MW2024-072.1 yrs
Ranksborough FarmSolar Photovoltaics10,000 homes28.0 MW2022-014.5 yrs
Morrison - Roof mounted solar panelsSolar Photovoltaics200 homes0.7 MW2022-064.2 yrs
Openfield, Colsterworth - Solar PV SystemSolar Photovoltaics100 homes0.4 MW2022-084.0 yrs
Cherryholt Road - Solar PanelsSolar Photovoltaics100 homes0.2 MW2022-083.9 yrs
Rutland Garden Centre, Ashwell Road - Solar PanelsSolar Photovoltaics100 homes0.2 MW2023-043.3 yrs

Plus 5 more approved within the last two years.

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.