No.404 of 650 · approved, not built MP: Sarah Champion (Labour) England

Rotherham

Rotherham has 1.3 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 500 homes. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. That cost is shared across every bill in Britain, so households here pay for it too: about £116 a year per household, £5.3m across the constituency's 45,916 homes.

Not visible
here
No big wind farm on the national grid is mapped to this constituency, so no switch-off payments show here in national data. Smaller wind farms on the local grid can still be paid to switch off — invisibly. The £ figure for this seat is a floor, not a zero.
1.3 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 500 homes. Approved at least two years ago; waiting on the grid, not on planning. That is 0.5× the renewable capacity actually running here.
2 projects · planning database (REPD), July 2026 · how we worked this out
£5.3m
is what the grid gap costs this constituency's 45,916 households in a year between them — £116 each, about 65 days of one home's electricity.
The £116 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

2 of 2 waiting projects · years since approval
Ickles Works, Templeborough - Solar Photovoltaics 0.5 MW
4.2 YRS
Advanced Blade Building, Brunel Way - Solar Photovoltaics 0.8 MW
2.0 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Advanced Blade Building, Brunel Way - Solar PhotovoltaicsAdvanced Blade Building Brunel Way CatcliffeSolar Photovoltaics300 homes0.8 MW2024-112.0 yrs
Ickles Works, Templeborough - Solar PhotovoltaicsIckles Works Ickles Way TempleboroughSolar Photovoltaics200 homes0.5 MW2022-094.2 yrs

Plus 1 more approved within the last two years.

Batteries

projects of 10 MW and above · planning database, July 2026 · what batteries do →
SiteSizeStatusWhile discharging
Maltby Solar Farm50 MWcould supply ≈175,000 homes
Claire Court, Rawmarsh Road - Battery Energy Storage Facility40 MWapproved, not built 2023could supply ≈140,000 homes
Brinsworth Road, Brinsworth - Battery Energy storage40 MWcould supply ≈140,000 homes

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →

What has Sarah Champion said about the grid in Parliament? Search Hansard →

See the full league table Data (JSON)