No.58 of 650 · approved, not built MP: Rishi Sunak (Conservative) England

Richmond and Northallerton

Richmond and Northallerton has 111 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 40,000 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.8m across the constituency's 40,947 homes.

Not visible
here
No big wind farm on the national grid is mapped to this constituency, so no switch-off payments show here in national data. Smaller wind farms on the local grid can still be paid to switch off — invisibly. The £ figure for this seat is a floor, not a zero.
111 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 40,000 homes — about as many homes as this constituency has. Approved at least two years ago; waiting on the grid, not on planning. That is 1.6× the renewable capacity actually running here.
9 projects · planning database (REPD), July 2026 · how we worked this out
£3.8m
is what the grid gap costs this constituency's 40,947 households in a year between them — £92 each, about 51 days of one home's electricity.
The £92 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

6 of 9 waiting projects · years since approval
South Lowfields Farm 50 MW
6.6 YRS
Broken Scar Water Treatment Works Solar Farm 9 MW
4.1 YRS
Poultry Unit, Park View Farm - Solar Panels 0.2 MW
3.8 YRS
Brompton Lakes, Easby - Solar PV System 0.2 MW
3.6 YRS
Foss Way, Walkerville Industrial Estate - Solar Panels 0.2 MW
3.5 YRS
Middleton Lodge, Kneeton Lane - Solar Panels 0.4 MW
3.4 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
South Lowfields FarmSolar Photovoltaics18,000 homes49.9 MW2019-126.6 yrs
Os Field 6800 Fence Dike Lane - Solar FarmSolar Photovoltaics18,000 homes49.9 MW2023-063.1 yrs
Broken Scar Water Treatment Works Solar FarmSolar Photovoltaics3,300 homes9.0 MW2022-064.1 yrs
AD Calvert Architectural, Stone Yard - Redevelopment Master PlanSolar Photovoltaics200 homes0.5 MW2024-022.5 yrs
Middleton Lodge, Kneeton Lane - Solar PanelsSolar Photovoltaics200 homes0.4 MW2023-023.4 yrs
Lark Hall Farm, Romanby - Ground Mounted Solar PanelsSolar Photovoltaics100 homes0.3 MW2023-033.4 yrs
Foss Way, Walkerville Industrial Estate - Solar PanelsSolar Photovoltaics100 homes0.2 MW2023-013.5 yrs
Poultry Unit, Park View Farm - Solar PanelsSolar Photovoltaics100 homes0.2 MW2022-113.8 yrs
Brompton Lakes, Easby - Solar PV SystemSolar Photovoltaics100 homes0.2 MW2023-013.6 yrs

Plus 5 more approved within the last two years.

Batteries

projects of 10 MW and above · planning database, July 2026 · what batteries do →
SiteSizeStatusWhile discharging
Mowbray Battery Energy Storage Station1,000 MWcould supply ≈3,504,000 homes
Darlington Road, Skeeby - Battery Energy Storage35 MWbeing built 2023could supply ≈123,000 homes

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →

What has Rishi Sunak said about the grid in Parliament? Search Hansard →

See the full league table Data (JSON)