Redditch
Redditch has 3.3 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 1,200 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.8m across the constituency's 41,332 homes.
here
The waiting list
Every approved, unbuilt project
| Site | Technology | Enough for | Capacity | Approved | Waiting |
|---|---|---|---|---|---|
| Thorlux Lighting Moons, Merse Road - Solar PV system | Solar Photovoltaics | 500 homes | 1.4 MW | 2022-02 | 4.4 yrs |
| Worcester Road, Wychbold - Solar Photovoltaic Panels | Solar Photovoltaics | 400 homes | 1.0 MW | 2022-10 | 3.8 yrs |
| Hsh Coldstores Limited, Moons Moat Drive - Solar panels | Solar Photovoltaics | 100 homes | 0.4 MW | 2023-04 | 3.3 yrs |
| Sparlonz Limited - Solar Panels | Solar Photovoltaics | 100 homes | 0.2 MW | 2021-12 | 4.6 yrs |
| Evesham Garden Centre, Evesham Country Park - Solar Panels | Solar Photovoltaics | 100 homes | 0.2 MW | 2023-04 | 3.3 yrs |
Plus 2 more approved within the last two years.
Batteries
| Site | Size | Status | While discharging |
|---|---|---|---|
| Wheaten Hill Farm - BESS | 400 MW | in planning | could supply ≈1,402,000 homes |
| Rectory Farm, Rectory Lane - Battery Storage | 30 MW | approved, not built 2023 | could supply ≈105,000 homes |
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →
What has Chris Bloore said about the grid in Parliament? Search Hansard →