Rayleigh and Wickford
Rayleigh and Wickford has 80 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 29,000 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.7m across the constituency's 39,933 homes.
here
The waiting list
Every approved, unbuilt project
| Site | Technology | Enough for | Capacity | Approved | Waiting |
|---|---|---|---|---|---|
| South Fambridge Hall - Solar farm & Battery storage | Solar Photovoltaics | 18,000 homes | 50.0 MW | 2021-12 | 4.6 yrs |
| Great Wheatley Road - Solar Farm | Solar Photovoltaics | 11,000 homes | 30.0 MW | 2024-03 | 2.4 yrs |
Plus 2 more approved within the last two years.
Batteries
| Site | Size | Status | While discharging |
|---|---|---|---|
| Fairlawns Farm, Chelmsford Road - Battery Energy Storage | 480 MW | approved, not built 2025 | could supply ≈1,682,000 homes |
| Rayleigh Spur Roundabout, Benfleet - Battery Energy Storage System | 150 MW | in planning | could supply ≈526,000 homes |
| Dollymans Storage | 100 MW | 2021 | could supply ≈350,000 homes |
| South Fambridge Hall - Solar farm & Battery storage | 20 MW | being built 2021 | could supply ≈70,000 homes |
| Nevendon | 10 MW | could supply ≈35,000 homes |
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →
What has Mr Mark Francois said about the grid in Parliament? Search Hansard →