No.27 of 650 · approved, not built MP: James Wild (Conservative) England

North West Norfolk

North West Norfolk has 166 MW of clean power (almost all solar) approved and still not built: enough to supply a year's electricity to 61,000 homes. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. That cost is shared across every bill in Britain, so households here pay for it too: about £92 a year per household, £4.2m across the constituency's 45,613 homes. There is also 24 MW of wind running here on the local network. If that gets switched off, no national record shows it.

Not visible
here
24 MW of wind is running in this constituency, but it sits on the local network rather than the national grid — so if it is paid to switch off, no national record shows it. That is why this seat has no figure here: not because nothing happens, but because nobody publishes it. The £ figure for this seat is a floor, not a zero.
166 MW
of clean power — almost all solar — approved and still not built, enough to supply a year's electricity to 61,000 homes — about as many homes as this constituency has. Approved at least two years ago; waiting on the grid, not on planning. That is 2.0× the renewable capacity actually running here.
10 projects · 164 MW solar, 1.5 MW onshore wind · planning database (REPD), July 2026 · how we worked this out
£4.2m
is what the grid gap costs this constituency's 45,613 households in a year between them — £92 each, about 51 days of one home's electricity.
The £92 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

4 of 10 waiting projects · years since approval
Walpole Bank 40 MW
5.5 YRS
Estuary Farm, Edward Benefer Way - Solar Farm & Battery Storage 50 MW
4.6 YRS
Sedgeford Hall Estate - Solar Panels & Battery Storage 21 MW
2.9 YRS
Meerdyke Solar Panels & Battery Storage 50 MW
2.4 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Estuary Farm, Edward Benefer Way - Solar Farm & Battery StorageSolar Photovoltaics18,000 homes49.9 MW2021-124.6 yrs
Meerdyke Solar Panels & Battery StorageSolar Photovoltaics18,000 homes49.9 MW2024-032.4 yrs
Walpole BankSolar Photovoltaics15,000 homes40.0 MW2021-015.5 yrs
Sedgeford Hall Estate - Solar Panels & Battery StorageSolar Photovoltaics7,600 homes21.0 MW2023-082.9 yrs
Sandringham Estate - Solar ArraySolar Photovoltaics800 homes2.1 MW2024-072.1 yrs
Pil Membranes, Estuary Road - Wind TurbineWind Onshore1,300 homes1.5 MW2023-033.4 yrs
Wm Morrisons- Solar Photovoltaic SystemSolar Photovoltaics200 homes0.5 MW2022-044.3 yrs
Princes Truna Limited, Walsoken - Solar PanelsSolar Photovoltaics200 homes0.5 MW2024-052.2 yrs
Saddlebow Road - Solar ArraySolar Photovoltaics100 homes0.2 MW2023-082.9 yrs
Oldmedow Road - Solar PanelsSolar Photovoltaics100 homes0.2 MW2022-044.3 yrs

Plus 6 more approved within the last two years.

Batteries

projects of 10 MW and above · planning database, July 2026 · what batteries do →
SiteSizeStatusWhile discharging
Lapwing Fen 2 - Battery Storage Plant250 MWbeing built 2020could supply ≈876,000 homes
Walsoken, Burrettgate Road - Battery Storage Facility200 MWapproved, not built 2025could supply ≈701,000 homes
North Walpole, St Peter - Battery Energy Storage100 MWapproved, not built 2022could supply ≈350,000 homes
Walpole St Andrew - Battery storage100 MWapproved, not built 2022could supply ≈350,000 homes
Walpole Sub Station, Walpole Bank - Battery Storage100 MWapproved, not built 2023could supply ≈350,000 homes
Walpole Sub Station, Walpole Bank - Battery Storage100 MWapproved, not built 2023could supply ≈350,000 homes
Walpole Bank - Battery Energy Storage Facility100 MWcould supply ≈350,000 homes
Lapwing Fen II, Crown Farm50 MWapproved, not built 2020could supply ≈175,000 homes
Model Farm50 MWapproved, not built 2022could supply ≈175,000 homes
Estuary Farm, Edward Benefer Way - Solar Farm & Battery Storage15 MWapproved, not built 2021could supply ≈53,000 homes

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →

What has James Wild said about the grid in Parliament? Search Hansard →

See the full league table Data (JSON)