No.266 of 650 · approved, not built MP: Kit Malthouse (Conservative) England

North West Hampshire

North West Hampshire has 4.7 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 1,700 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.1m across the constituency's 44,686 homes.

Not visible
here
No big wind farm on the national grid is mapped to this constituency, so no switch-off payments show here in national data. Smaller wind farms on the local grid can still be paid to switch off — invisibly. The £ figure for this seat is a floor, not a zero.
4.7 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 1,700 homes. Approved at least two years ago; waiting on the grid, not on planning. That is 0.1× the renewable capacity actually running here.
9 projects · planning database (REPD), July 2026 · how we worked this out
£4.1m
is what the grid gap costs this constituency's 44,686 households in a year between them — £92 each, about 51 days of one home's electricity.
The £92 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

6 of 9 waiting projects · years since approval
Howard Tenens, Assent 100, Stephenson Close, - Solar Panels 0.9 MW
4.1 YRS
Howard Tenens Limited, Plot 4, Portway Business Park - Solar Panels 0.7 MW
4.1 YRS
Howard Tenens, Plot 5, West Portway - Solar Panels 0.6 MW
4.1 YRS
Units 1 And 2, Assent 40, Plot 12, Portway Business Park - Solar Panels 0.4 MW
4.1 YRS
Howard Tenens, Plot 2, West Portway - Solar Panels 0.3 MW
4.1 YRS
Walworth Business Park - Solar Photovoltaics panel 0.2 MW
4.0 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
R Twining And Company, South Way - Solar PanelsSolar Photovoltaics400 homes1.0 MW2023-083.0 yrs
Howard Tenens, Assent 100, Stephenson Close, - Solar PanelsSolar Photovoltaics300 homes0.9 MW2022-064.1 yrs
Howard Tenens Limited, Plot 4, Portway Business Park - Solar PanelsSolar Photovoltaics300 homes0.7 MW2022-064.1 yrs
Howard Tenens, Plot 5, West Portway - Solar PanelsSolar Photovoltaics200 homes0.6 MW2022-064.1 yrs
Units 1 And 2, Assent 40, Plot 12, Portway Business Park - Solar PanelsSolar Photovoltaics100 homes0.4 MW2022-064.1 yrs
Howard Tenens, Plot 2, West Portway - Solar PanelsSolar Photovoltaics100 homes0.3 MW2022-064.1 yrs
Southley Farm Buildings, Overton - Solar PanelsSolar Photovoltaics100 homes0.3 MW2023-033.4 yrs
Preformed Line Products, East Portway - Solar PanelsSolar Photovoltaics100 homes0.3 MW2024-052.2 yrs
Walworth Business Park - Solar Photovoltaics panelSolar Photovoltaics100 homes0.2 MW2022-074.0 yrs

Plus 4 more approved within the last two years.

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →