North West Cambridgeshire
North West Cambridgeshire has 14 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 5,200 homes. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. That cost is shared across every bill in Britain, so households here pay for it too: about £116 a year per household, £5.4m across the constituency's 46,790 homes.
here
The waiting list
Every approved, unbuilt project
| Site | Technology | Enough for | Capacity | Approved | Waiting |
|---|---|---|---|---|---|
| Wittering Ford Road, Barnack - Solar Photovoltaic FarmWittering Ford Road, Barnack, Stamford | Solar Photovoltaics | 4,000 homes | 11.0 MW | 2023-11 | 3.0 yrs |
| J S Davidson Limited, Shrewsbury Avenue - Solar PV panelsChiltern Cold Storage Group Limited, Shrewsbury Avenue, Woodston, Peterborough | Solar Photovoltaics | 500 homes | 1.4 MW | 2024-09 | 2.1 yrs |
| Kiddicare, Club Way - Solar PanlesKiddicare Club Way Cygnet Park | Solar Photovoltaics | 300 homes | 1.0 MW | 2024-05 | 2.5 yrs |
| Strada Alwalton Hill - Solar PanelsUnit 1 Strada Alwalton Hill, Peterborough | Solar Photovoltaics | 300 homes | 0.7 MW | 2022-07 | 4.4 yrs |
| Nene Park Academy, Orton Longueville - Photovoltaic PanelsNene Park Academy, Oundle Road, Orton Longueville, Peterborough | Solar Photovoltaics | 100 homes | 0.3 MW | 2022-10 | 4.1 yrs |
Plus 3 more approved within the last two years.
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →
What has Sam Carling said about the grid in Parliament? Search Hansard →