No.230 of 650 · approved, not built MP: Steff Aquarone (Liberal Democrat) England

North Norfolk

North Norfolk has 9.7 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 3,500 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.8m across the constituency's 41,026 homes.

Not visible
here
No big wind farm on the national grid is mapped to this constituency, so no switch-off payments show here in national data. Smaller wind farms on the local grid can still be paid to switch off — invisibly. The £ figure for this seat is a floor, not a zero.
9.7 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 3,500 homes. Approved at least two years ago; waiting on the grid, not on planning. That is 0.1× the renewable capacity actually running here.
11 projects · planning database (REPD), July 2026 · how we worked this out
£3.8m
is what the grid gap costs this constituency's 41,026 households in a year between them — £92 each, about 51 days of one home's electricity.
The £92 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

6 of 11 waiting projects · years since approval
Wayside Farm 5 MW
10.5 YRS
Paston Road, Bacton - Solar Photovoltaic Array 1.6 MW
3.8 YRS
The Reef Leisure Centre - Solar Panels 0.4 MW
3.5 YRS
Laurels Farm, Laurels Road - Solar PV Array 0.2 MW
3.5 YRS
Hole Farm House, Hole Farm Road - Solar Panels 0.3 MW
3.4 YRS
R And Jm Pace, Church Road - Solar Array 1.1 MW
3.3 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Wayside FarmSolar Photovoltaics1,800 homes5.0 MW2016-0210.5 yrs
Paston Road, Bacton - Solar Photovoltaic ArraySolar Photovoltaics600 homes1.6 MW2022-093.8 yrs
R And Jm Pace, Church Road - Solar ArraySolar Photovoltaics400 homes1.1 MW2023-043.3 yrs
The Reef Leisure Centre - Solar PanelsSolar Photovoltaics100 homes0.4 MW2023-013.5 yrs
Hole Farm House, Hole Farm Road - Solar PanelsSolar Photovoltaics100 homes0.3 MW2023-033.4 yrs
Laurels Farm, Laurels Road - Solar PV ArraySolar Photovoltaics100 homes0.2 MW2023-023.5 yrs
Victory Swim and Fitness Centre, Station Road - Solar PanelsSolar Photovoltaics100 homes0.2 MW2024-042.3 yrs
Barningham Road - Ground Mounted Solar PanelsSolar Photovoltaics100 homes0.2 MW2023-053.2 yrs
Back Lane, Hempstead - Solar PV SystemSolar Photovoltaics100 homes0.2 MW2023-063.1 yrs
Plumstead Road, Edgefield - Solar PanelsSolar Photovoltaics100 homes0.2 MW2023-053.2 yrs
Holt Road - Solar ArraySolar Photovoltaics100 homes0.2 MW2023-053.2 yrs

Plus 1 more approved within the last two years.

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →

What has Steff Aquarone said about the grid in Parliament? Search Hansard →

See the full league table Data (JSON)