No.325 of 650 · approved, not built MP: Dr Ellie Chowns (Green Party) England

North Herefordshire

North Herefordshire has 2.3 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 800 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.7m across the constituency's 39,991 homes.

Not visible
here
No big wind farm on the national grid is mapped to this constituency, so no switch-off payments show here in national data. Smaller wind farms on the local grid can still be paid to switch off — invisibly. The £ figure for this seat is a floor, not a zero.
2.3 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 800 homes. Approved at least two years ago; waiting on the grid, not on planning.
7 projects · planning database (REPD), July 2026 · how we worked this out
£3.7m
is what the grid gap costs this constituency's 39,991 households in a year between them — £92 each, about 51 days of one home's electricity.
The £92 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

6 of 7 waiting projects · years since approval
Manor Farm Solar Panels 0.3 MW
5.5 YRS
Brierley Court Hop Farm, Brierley Lane - Solar Panels 0.6 MW
3.7 YRS
Morrisons Supermarket - Photovoltaic Solar Panels 0.2 MW
3.7 YRS
The Hop Pocket - Solar Panels
2.7 YRS
Woofferton Transmitting Station - Solar Panel Arrays 0.5 MW
2.4 YRS
Oakchurch Farm Shop, Staunton On Wye - Solar Array 0.3 MW
2.2 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Brierley Court Hop Farm, Brierley Lane - Solar PanelsSolar Photovoltaics200 homes0.6 MW2022-113.7 yrs
Woofferton Transmitting Station - Solar Panel ArraysSolar Photovoltaics200 homes0.5 MW2024-032.4 yrs
Oakchurch Farm Shop, Staunton On Wye - Solar ArraySolar Photovoltaics100 homes0.3 MW2024-052.2 yrs
Manor Farm Solar PanelsSolar Photovoltaics100 homes0.3 MW2021-025.5 yrs
Shobdon Poultry Farm, Shobdon - Solar PV ArraySolar Photovoltaics100 homes0.3 MW2024-052.2 yrs
Morrisons Supermarket - Photovoltaic Solar PanelsSolar Photovoltaics100 homes0.2 MW2022-113.7 yrs
The Hop Pocket - Solar PanelsSolar Photovoltaics— MW2023-122.7 yrs

Plus 3 more approved within the last two years.

Batteries

projects of 10 MW and above · planning database, July 2026 · what batteries do →
SiteSizeStatusWhile discharging
Land to the west of Clay Hill Pit / Larport Farm20 MWoperatingcould supply ≈70,000 homes

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →

What has Dr Ellie Chowns said about the grid in Parliament? Search Hansard →