No.112 of 650 · approved, not built MP: Sir Geoffrey Clifton-Brown (Conservative) England

North Cotswolds

North Cotswolds has 55 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 20,000 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £3.7m across the constituency's 40,206 homes.

Not visible
here
No big wind farm on the national grid is mapped to this constituency, so no switch-off payments show here in national data. Smaller wind farms on the local grid can still be paid to switch off — invisibly. The £ figure for this seat is a floor, not a zero.
55 MW
of clean power — all solar — approved and still not built, enough to supply a year's electricity to 20,000 homes. Approved at least two years ago; waiting on the grid, not on planning. That is 4.0× the renewable capacity actually running here.
13 projects · planning database (REPD), July 2026 · how we worked this out
£3.7m
is what the grid gap costs this constituency's 40,206 households in a year between them — £92 each, about 51 days of one home's electricity.
The £92 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

6 of 13 waiting projects · years since approval
Moreton Lane - Solar Farm & Battery Storage 50 MW
4.3 YRS
Unit Q1, Quadrant Distribution Centre, Hardwick - Solar Panels 1 MW
4.2 YRS
Plant 4, Hurricane Road, Gloucester Business Park - Solar Panels 1 MW
3.9 YRS
The Io Centre, Gloucester Business Park - Solar Panels 0.2 MW
3.7 YRS
Plant 1, G-Tekt Europe Manufacturing Limited -Roof Mounted Solar Panels 1 MW
3.6 YRS
Tbs Engineering, Gloucester Business Park - Solar Panels 0.5 MW
3.2 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Moreton Lane - Solar Farm & Battery StorageSolar Photovoltaics18,000 homes49.9 MW2022-044.3 yrs
Plant 4, Hurricane Road, Gloucester Business Park - Solar PanelsSolar Photovoltaics400 homes1.0 MW2022-093.9 yrs
Plant 1, G-Tekt Europe Manufacturing Limited -Roof Mounted Solar PanelsSolar Photovoltaics400 homes1.0 MW2022-123.6 yrs
Unit Q1, Quadrant Distribution Centre, Hardwick - Solar PanelsSolar Photovoltaics400 homes1.0 MW2022-054.2 yrs
Tbs Engineering, Gloucester Business Park - Solar PanelsSolar Photovoltaics200 homes0.5 MW2023-053.2 yrs
MG Markey Group, Quadrant Way - Solar panelsSolar Photovoltaics100 homes0.3 MW2024-032.4 yrs
Cotswold School, Station Road - Solar PanelsSolar Photovoltaics100 homes0.3 MW2023-112.7 yrs
Anson Business Park, Cheltenham Road East - Solar PanelsSolar Photovoltaics100 homes0.3 MW2023-063.1 yrs
Safran Landing System, Down Hatherley Lane - Solar PanelsSolar Photovoltaics100 homes0.3 MW2023-053.2 yrs
The Io Centre, Gloucester Business Park - Solar PanelsSolar Photovoltaics100 homes0.2 MW2022-113.7 yrs
The IO Centre, Gloucester Business Park - Solar PanelsSolar Photovoltaics100 homes0.2 MW2023-122.6 yrs
Hangmans Hall Farm, Broad Campden - Solar PanelsSolar Photovoltaics100 homes0.2 MW2023-053.2 yrs
Peters Farm, Middle Hill - Solar PanelsSolar Photovoltaics100 homes0.1 MW2024-062.1 yrs

Plus 5 more approved within the last two years.

Batteries

projects of 10 MW and above · planning database, July 2026 · what batteries do →
SiteSizeStatusWhile discharging
Moreton Lane - Solar Farm & Battery Storage50 MWapproved, not built 2022could supply ≈175,000 homes
Brockworth Road - Battery Storage System20 MWapproved, not built 2024could supply ≈70,000 homes

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →

What has Sir Geoffrey Clifton-Brown said about the grid in Parliament? Search Hansard →

See the full league table Data (JSON)