Newcastle upon Tyne North
Newcastle upon Tyne North has 2.7 MW of clean power (all solar) approved and still not built: enough to supply a year's electricity to 1,000 homes. Britain's grid bottlenecks still add to bills here: about £92 a year per household, £4.2m across the constituency's 45,290 homes.
here
The waiting list
Every approved, unbuilt project
| Site | Technology | Enough for | Capacity | Approved | Waiting |
|---|---|---|---|---|---|
| Gosforth Academy, Knightsbridge - Solar Panels | Solar Photovoltaics | 200 homes | 0.5 MW | 2023-09 | 2.9 yrs |
| Royal Grammar School, Eskdale Terrace - Solar Panels | Solar Photovoltaics | 200 homes | 0.5 MW | 2023-03 | 3.4 yrs |
| David Lloyd Leisure, Castles Farm Road - Solar Panels | Solar Photovoltaics | 100 homes | 0.3 MW | 2023-07 | 3.0 yrs |
| YHN House, Benton Park Road- Solar Photovoltaic Panels | Solar Photovoltaics | 100 homes | 0.3 MW | 2021-12 | 4.6 yrs |
| Newington Road West Depot - Solar Panels | Solar Photovoltaics | 100 homes | 0.2 MW | 2022-02 | 4.5 yrs |
| Brunton First School, Roseden Way - Solar Panels | Solar Photovoltaics | 100 homes | 0.2 MW | 2023-08 | 2.9 yrs |
| Corchester Walk - Solar Photovoltaic Panels & Air Sourced Heat Pumps | Solar Photovoltaics | 100 homes | 0.2 MW | 2022-05 | 4.2 yrs |
| Welford Day Centre, Jubilee Road - Solar panels | Solar Photovoltaics | 100 homes | 0.2 MW | 2023-08 | 2.9 yrs |
| The Kenton Centre - Solar Panels | Solar Photovoltaics | 100 homes | 0.2 MW | 2024-05 | 2.2 yrs |
| Grange First School, Norham Road - Solar Panels | Solar Photovoltaics | 100 homes | 0.1 MW | 2023-08 | 2.9 yrs |
Plus 3 more approved within the last two years.
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →
What has Catherine McKinnell said about the grid in Parliament? Search Hansard →