No.13 OF 650 · APPROVED, NOT BUILT MP: Robert Jenrick (Reform UK) England

Newark

Newark has 295 MW of clean power (almost all solar) approved and still not built: enough to supply a year's electricity to 107,000 homes. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. That cost is shared across every bill in Britain, so households here pay for it too: about £92 a year per household, £4.2m across the constituency's 45,490 homes.

Not visible
here
9 MW of wind is running in this constituency, but it sits on the local network rather than the national grid — so if it is paid to switch off, no national record shows it. That is why this seat has no figure here: not because nothing happens, but because nobody publishes it. The £ figure for this seat is a floor, not a zero.
295 MW
of clean power — almost all solar — approved and still not built, enough to supply a year's electricity to 107,000 homes — 2 times every household in this constituency. Approved at least two years ago; waiting on the grid, not on planning. That is 2.7× the renewable capacity actually running here.
13 projects · 294 MW solar, 0.3 MW hydro · planning database (REPD), July 2026 · how we worked this out
£4.2m
is what the grid gap costs this constituency's 45,490 households in a year between them — £92 each, about 51 days of one home's electricity.
The £92 per household is a national figure — identical in every GB seat. Only the seat total varies, with the number of households · NESO · how we worked this out

The waiting list

6 of 13 waiting projects · years since approval
Wood Lane Solar Farm 50 MW
5.9 YRS
Winkburn Estate Solar Farm 50 MW
5.2 YRS
Tuxford Road Solar Farm 50 MW
4.6 YRS
Cotmoor Lane 50 MW
4.5 YRS
High Marnham - Solar Photovoltaic Farm 43 MW
3.6 YRS
Tiln Farm Solar Farm 50 MW
2.9 YRS

Every approved, unbuilt project

approved 24+ months ago, still not generating · planning database, July 2026
SiteTechnologyEnough forCapacityApprovedWaiting
Cotmoor LaneSolar Photovoltaics18,000 homes49.9 MW2022-024.5 yrs
Tiln Farm Solar FarmSolar Photovoltaics18,000 homes49.9 MW2023-092.9 yrs
Wood Lane Solar FarmSolar Photovoltaics18,000 homes49.9 MW2020-085.9 yrs
Tuxford Road Solar FarmSolar Photovoltaics18,000 homes49.9 MW2021-124.6 yrs
Winkburn Estate Solar FarmSolar Photovoltaics18,000 homes49.9 MW2021-055.2 yrs
High Marnham - Solar Photovoltaic FarmSolar Photovoltaics16,000 homes42.7 MW2023-013.6 yrs
Ossington Road, Carlton On Trent- Solar PanelsSolar Photovoltaics300 homes0.9 MW2023-083.0 yrs
Clay Farm, South Scarle Lane - Solar PanelsSolar Photovoltaics200 homes0.6 MW2023-023.5 yrs
Gunthorpe WeirSmall Hydro300 homes0.3 MW2019-037.4 yrs
New Lane, Whatton - Solar Photovoltaic SystemSolar Photovoltaics100 homes0.2 MW2022-024.5 yrs
Grange Farm, Low Marnham - Solar PanelsSolar Photovoltaics100 homes0.2 MW2023-043.3 yrs
Smite Lane Farm, Thoroton - Solar PanelsSolar Photovoltaics100 homes0.2 MW2022-093.9 yrs
Flash Farm, Micklebarrow Hill - Solar PanelsSolar Photovoltaics100 homes0.1 MW2023-013.6 yrs

Plus 10 more approved within the last two years.

Batteries

projects of 10 MW and above · planning database, July 2026 · what batteries do →
SiteSizeStatusWhile discharging
West Burton Power Station, North Road - Battery Storage500 MWapproved, not built 2024could supply ≈1,752,000 homes
Torksey Ferry Road, Rampton - Battery Energy Storage500 MWapproved, not built 2026could supply ≈1,752,000 homes
Polly Taylors Road, High Marnham - Battery Energy Storage System400 MWcould supply ≈1,402,000 homes
Staythorpe Road - Battery energy storage360 MWbeing built 2024could supply ≈1,261,000 homes
Staythorpe Road, Averham - Battery Storage300 MWcould supply ≈1,051,000 homes
Steeple Renewables Project150 MWcould supply ≈526,000 homes
Cottom Power Station50 MWcould supply ≈175,000 homes
Main Street, Kelham - Solar Farm & Battery Energy Storage50 MWapproved, not built 2025could supply ≈175,000 homes
West Burton49 MWoperatingcould supply ≈172,000 homes
Cottam Power Station49 MWapproved, not built 2020could supply ≈172,000 homes

What this page does not show

Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.

Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.

Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →

Read the full method, including everything we cannot see →

What has Robert Jenrick said about the grid in Parliament? Search Hansard →

See the full league table Data (JSON)