Na h-Eileanan an Iar
Na h-Eileanan an Iar has 254 MW of clean power (all onshore wind) approved and still not built: enough to supply a year's electricity to 222,000 homes. When the wires are too full to carry the power, Britain pays wind farms to switch off instead. No wind farm here is paid that way — almost all of it goes to wind farms in Scotland. That cost is shared across every bill in Britain, so households here pay for it too: about £92 a year per household, £1.2m across the constituency's 12,717 homes. There is also 38 MW of wind running here on the local network. If that gets switched off, no national record shows it.
here
The waiting list
Every approved, unbuilt project
| Site | Technology | Enough for | Capacity | Approved | Waiting |
|---|---|---|---|---|---|
| Stornoway Wind Farm (second resubmission) | Wind Onshore | 171,000 homes | 196.0 MW | 2022-01 | 4.6 yrs |
| Druim Leathann Windfarm | Wind Onshore | 42,000 homes | 48.3 MW | 2022-06 | 4.1 yrs |
| Sandwick North St Community wind turbine | Wind Onshore | 4,400 homes | 5.0 MW | 2019-11 | 6.7 yrs |
| Beinn Thulabaigh Wind Turbine | Wind Onshore | 4,400 homes | 5.0 MW | 2020-05 | 6.2 yrs |
Plus 2 more approved within the last two years.
Batteries
| Site | Size | Status | While discharging |
|---|---|---|---|
| Battery Point, Newton Street - Battery Energy Storage Park | 25 MW | approved, not built 2024 | could supply ≈88,000 homes |
What this page does not show
Smaller wind farms on the local grid are also switched off; national data does not show it, so the £ figure here is a floor, not a zero. Offshore wind is counted nationally, never per seat. The planning database can run a quarter behind reality.
Electricity does not travel from a particular project to particular houses. Everything generated goes into the national grid and everyone draws from that shared pool, so "enough for X homes" is a way of sizing the electricity — not a claim that these homes would be powered by this site. Battery storage is counted separately from generation: it moves power in time rather than making it.
Planning statuses come from the government's planning database (REPD), which records what was decided and when, but not why. Where a project was refused we say so and name the authority; for the reasons, look up the planning reference on that council's own register. How to check any figure on this page →
What has Torcuil Crichton said about the grid in Parliament? Search Hansard →